1/5

Best Price Industrial Natural Gas Turbine Generator 500kw

Purchase Qty. / FOB Price:

Get Latest Price
US$ 5,000.00-200,000.00 / Piece Min. Order: 1 Piece
Secured Trading Service
From payment to delivery, we guarantee your trading security without charges.
300 Sets/Month

Quick Details

PDG-500GF
AC Three Phase
Natural Gas
CE, ISO
Standard
Deutz or Cummins, Styer, Ricardo
Brushless Alternator
Natural Gas Biogas Fuel
Electric Start
Oil Field, Factory etc
Parallel Grid System
CHP
Customers' Requirements
Deepsea, Smargen
15 Years
PULITA ENERGY
Plywood Package by Seaway
Engine, Alternator, automatic control panel
China
85022
View All
Shandong Pulita New Energy Technology Co., Ltd.

Member Since: 2018

Business Type: Manufacturer/Factory & Trading Company

Weifang, Shandong, China

You Might Also Like

Customers Also Viewed

Related Videos

Failed to load data.

Product Details

Best price industrial natural gas turbine generator 500kw

Related products:

 
Requirments for natural gas / biogas / biomass gas / LPG LNG etc.

1.Methane should be at least 50%
2.The natural gas temperature should be between 0-60 ºC
3. No inpurity should be in the gas. Water in the gas should be less than 20g/Nm3.
4. Heat value should be at least 8500kcal/m3, if less than this value, the power of the engine will be declined.
5. Gas pressure should be 3-100KPa, if the pressure is less than 3KPa, booster fan is necessary.
6.The gas should be dehydrated and desulfurated. Make sure that there is no liquid in the gas. H2S<200mg/Nm


Models list

Model of genset

PDG-XXGF

Model of engine

Deutz,Cummis,Man,Weichai

Type

Four Stroke,Spark Plug Ignition

Model of alternator

Faraday,Stamford,Siemens

Rated speed(r/min)

1500/1800/1000

Rated power(kW/kVA)

10-1200kW

Cylinder numbers and Type

4 cylinders in line,6 Cylinders in line,6V

Rated voltage(V)

400V/230V

Rated frequency(Hz)

50/60

Rated power factor

0.8 lagging

Voltage regulation

Automatic

Supply connecting

3 phase 4 wire

Governor

Electric governor

Control model

Remote electric control, Hand control

Starting method

12V DC electric starting motor

Cooling method

Water cooling system


Successful projects:





Company Information and Certificates



Application:




FAQ

1.What's your power range of gas generators?

Re: We can offer the range from 10kW~1000kW. 

2.What's your delivery time?

Re: 7-25 work days after we get the down payment, if your order is some special engine and alternator, then the delivery time is longer.

3.What's your payment?

Re: We accept T/T, L/C, Made-in-china pay also acceptable.

4.What's your warranty?

Re: All our products we offer one year warranty or 1500 hours which comes first.

5.What's your MOQ?

Re: One set. 

6.What's the frequency of gas generators?

Re: 50Hz/60Hz.

7.Do you have single phase or three phase gas generators?

Re: Sure, we have single phase and three phase gas generators. 

8.What's the voltage of your gas generator?

Re: 220/110V, 380/220V, 400/230V, 415/240V, 440/260V, 460/270V, and double voltage. 


View More

Recommended for You

No More Data
Can't see all? Click Here.
Failed to load data.
Not exactly what you want? Post Sourcing Request