After-sales Service: | Support Customization |
---|---|
Power Source: | Electric |
Automatic Grade: | Full-Automatic |
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
The wood pulverizer produced by our factory integrates slicing and crushing, and can cut wood with a diameter of 1-20 centimeters. It can also be used for cutting and crushing fiber like materials such as bamboo, straw, mushroom, garden branches, corn cobs, etc.It is a new type of production equipment for wood crushing. This wood grinder is particularly suitable for processing wood chips in edible mushroom culture media, and can also be used as raw materials for the production of particleboard and sawdust board high-density boards. |
Installation and commissioning operations 1. Configure the appropriate power cord and control switch according to the power configuration of the device, connect the power supply, and check if the motor direction is correct. 2. The equipment should be installed on a horizontal concrete foundation and fixed with anchor bolts. 3. When installing, it should be noted that the main engine pulley and motor pulley are pulled in a straight line using a triangular belt 4. After installation, check whether the bolts in each part are loose and whether the main engine compartment door is fastened. If there is any looseness, please tighten it 5. It is strictly prohibited to throw wood with stones and nails into the machine to prevent damage to the knives and internal parts. 6. Pay attention to checking the hammer bolts. If any looseness is found, tighten them immediately. When the hammer and bolts are severely worn, they should be replaced 7. After the inspection is completed, conduct a no-load test run, and production can proceed once the test run is normal. 8. When the particles cannot reach the desired size, switch to a different pore size sieve. 9. When replacing the cutting tool, the blade extends 2-4mm beyond the flat surface of the cutting disc, and then tighten the bolt. If the pressure bolt thread is found to be worn, it should be replaced immediately to prevent damage to the sliding disc nut. |
FAQ Q:Are you a trading company or a manufacturing factory? A:We are a factory. Q:What is your delivery time? A:If the goods are in stock, it usually takes 7-10 days. If the goods are out of stock, it will take 15 to 30 days, calculated by quantity. Q:What is your payment method? A:30% of the total price should be paid in T/T as the down payment; 70% of the remaining payment should be paid in T/T before delivery. Q:Do you provide technical guidance? A:Yes, we will provide you with professional advice on the selection of models and the operation of equipment. |
Suppliers with verified business licenses