• YX80-180/225 Automatic Roof Panel Roll Forming Machine
  • YX80-180/225 Automatic Roof Panel Roll Forming Machine

YX80-180/225 Automatic Roof Panel Roll Forming Machine

Warranty: 1 Year
Certification: CE, ISO9001
Customized: Customized
Condition: New
Control Type: PLC Control System
Automatic Grade: Automatic
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2018

Suppliers with verified business licenses

Fujian, China
Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Years of Export Experience
The export experience of the supplier is more than 10 years
to see all verified strength labels (27)

Basic Info.

Model NO.
YX80-180/225
Effective Width
180/225 mm
Thickness
0.4-0.7 mm
Yield Strength
245 MPa
Transport Package
40gp*1
Specification
12T
Trademark
Xiamen Liming
Origin
Fujian, China(Mainland)
Production Capacity
60 Set/Month

Product Description


This Producing Process Sketch As Below Picture:

YX80-180/225 Automatic Roof Panel Roll Forming Machine

This Profile Drawing As Below Picture:

YX80-180/225 Automatic Roof Panel Roll Forming Machine



 
General Parameter
1 Item Parameters
2 Model NO. YX80-180/225
3 Material Pre-painted galvanized sheet
4 Thickness 0.4-0.7 mm
5 Yield Strength 245 MPa
6 Feed Width 1220 mm
7 Effective width 188/225 mm
8 Roll Stages 20 Stages
9 Shafts Diameter ф75 mm
10 Main Motor Power 7.5 KW
11 Hydraulic Group Power 5.5 KW
12 Max. Line Speed Of Roll Former Approx.15 m/min
13 Electric Standard According to local voltage


Machine Components
 
A.  3Ton X 600 Hydraulic Un-coiler
Hydraulic system for expansion coil-inner-hole with 4 palms
Link-connect expanding system
Pump power=1.5KW
Frequency Inverter to regulate turning speed: Motor: 4 KW
Load capacity=3 Ton;Coil Inner - diameter =451-530 mm
Coil outer-diameter=Max. 1500 mm
Coiler Width=Max. 600 mm
Driving motor to turn the coil
Automatic stopping device with limited switch as assistance to control stop/start rotation

YX80-180/225 Automatic Roof Panel Roll Forming Machine

B.  Entry bench and manual pre-shearing device
Working thickness: up to 1.0 mm
Smart cut control, to cut off the end of the final piece of sheet only


C.  Cold Rolling Mills
Feeding section with guide;
Gear/Sprocket driving; 20 stages to form

 New-stand-frame-design
 Rollers manufactured from 45#, hard chrome coating 
 Shafts Diameter=ф75mm, Precision Machined
 Main motor =7.5KW
 Max line speed of roll former: Approx.15m/min
 Protection Mesh Cover (full mesh type) Above Roll-former To Avoid Hands Go Inside
YX80-180/225 Automatic Roof Panel Roll Forming Machine


 D.  Hydraulic Cutting Device
 Stop to cut, Post cut, slug cutting;
 Hydraulic group, Pump motor =5.5KW,
 Cutting tool material: Cr12Mov, Heat treatment
       
YX80-180/225 Automatic Roof Panel Roll Forming Machine

 D.  PLC Control System
 Control the quantity & cutting length automatically;
 Combined with: PLC, Touch Screen(SIEMENS), Inverter(Schneider),
 Encoder (Omron), etc
 Cut-to-length tolerance≤±2 mm
 Control voltage 24V


E.  Product Rack    Un-powered, 6 units
 
YX80-180/225 Automatic Roof Panel Roll Forming MachineYX80-180/225 Automatic Roof Panel Roll Forming Machine
 
After-Sale Service
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.

 
Terms Of Trade
1.Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.
2.Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now