• Wholesale Size Exterior Main House Entrance Front Armoured Bulletproof Aluminium/Aluminum Metal Pivot Swing Door Design Price
  • Wholesale Size Exterior Main House Entrance Front Armoured Bulletproof Aluminium/Aluminum Metal Pivot Swing Door Design Price
  • Wholesale Size Exterior Main House Entrance Front Armoured Bulletproof Aluminium/Aluminum Metal Pivot Swing Door Design Price
  • Wholesale Size Exterior Main House Entrance Front Armoured Bulletproof Aluminium/Aluminum Metal Pivot Swing Door Design Price
  • Wholesale Size Exterior Main House Entrance Front Armoured Bulletproof Aluminium/Aluminum Metal Pivot Swing Door Design Price
  • Wholesale Size Exterior Main House Entrance Front Armoured Bulletproof Aluminium/Aluminum Metal Pivot Swing Door Design Price

Wholesale Size Exterior Main House Entrance Front Armoured Bulletproof Aluminium/Aluminum Metal Pivot Swing Door Design Price

After-sales Service: 5years
Warranty: 2 Years
Material: Aluminum Alloy
Style: European
Open Style: Swing
Sound Insulation: 40
Customization:
Gold Member Since 2022

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Screen Netting Material
304 Net
Veneer Wood
Customized
Position
Exterior
Security Rating
A
Surface Finishing
Finished
Function
Security, Decoration
Transport Package
Standard Export Package
Specification
2600H X 8000W
Trademark
Sinogar
Origin
China
HS Code
7610100000
Production Capacity
10000sqm/Month

Product Description

Wholesale Size Exterior Main House Entrance Front Armoured Bulletproof Aluminium/Aluminum Metal Pivot Swing Door Design PriceFoshan Sinogar Aluminium Co., Ltd, founded in 1995, locates in Foshan " China Aluminum Industrial City". In past 20 years, the company has obtained a rapid development, turned into a large modern enterprise of professional manufacturing of aluminum profiles and fabricated aluminum parts in China.
Foshan Sinogar Aluminium Co., Ltd, There are800 staff working in 600,000 Square metre factory area in Guangdong. 15 sets of extrusion lines ranged from 500mt to 3600mt. Annual capacity reaches 80,000 tons.Our aluminium profiles and processing product cover more than 30 provinces and municipalities across the country and have been exported to more than 50 countries and regions around Asia, Africa, America and Europe, such as Indonesia, Philippines, Malaysia, South Africa, Spain, UK and Australia, and etc.
Wholesale Size Exterior Main House Entrance Front Armoured Bulletproof Aluminium/Aluminum Metal Pivot Swing Door Design Price
 
Aluminium Alloy 6063,6060,6061,6082
Temper T3-T8
Quality Standard GB/T 5237-2008, EN755-9,EN12020, JST,AA STANDARD. 
Quality Certificate ISO9001, ISO14001,OHSAS18001,DNV,QUALANOD, QUALICOAT
Useage Folding door
Surface Treatment Power coating: AKZO Noble, Tiger,DUPONT,JOTUN, etc.
PVDF: 2coated, 3 coated. 
Anodizing: Silver, Champagne, Bronze, Black,  Gold, Imitating Steel,Titanium
Wood grain: As per customers'samples.
Polishing, Mechanical, Chemcial.
Electrophoresis: Sliver,Champagne, Black, Golden,Titanium, etc.
Processing  Drilling, Bending, Aluminium profile fabrication, Precise cutting ect.
MOQ 3000 Kilogram
Packing protection film + shrink plastic film or kraft paper.
Timber packing + Metal trolly; 
Payment Terms TT 30% before production, the rest should be balanced before loading.
Wholesale Size Exterior Main House Entrance Front Armoured Bulletproof Aluminium/Aluminum Metal Pivot Swing Door Design PriceWholesale Size Exterior Main House Entrance Front Armoured Bulletproof Aluminium/Aluminum Metal Pivot Swing Door Design PriceWholesale Size Exterior Main House Entrance Front Armoured Bulletproof Aluminium/Aluminum Metal Pivot Swing Door Design PriceWholesale Size Exterior Main House Entrance Front Armoured Bulletproof Aluminium/Aluminum Metal Pivot Swing Door Design PriceWholesale Size Exterior Main House Entrance Front Armoured Bulletproof Aluminium/Aluminum Metal Pivot Swing Door Design PriceFAQ
1.Q:How long for the cutting dies and received sample?  

 A: Depend on the size of dies, gernerally speaking, 7-10 days for die cutting, 3days-5days sampling after die ready.   

2 Q:What is your lead time for production?      

A: For one 40ft container, 3-4week after deposit confimred. 100 tons can be ready within 4-5 weeks.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2022

Suppliers with verified business licenses

Manufacturer/Factory
Import & Export Mode
Have Own Export License
Terms of Payment
LC, T/T, D/P, Western Union