• Unisite Customized Coal Mining Machine Mining Equipment Gold Mining Trommels Parts.
  • Unisite Customized Coal Mining Machine Mining Equipment Gold Mining Trommels Parts.
  • Unisite Customized Coal Mining Machine Mining Equipment Gold Mining Trommels Parts.
  • Unisite Customized Coal Mining Machine Mining Equipment Gold Mining Trommels Parts.
  • Unisite Customized Coal Mining Machine Mining Equipment Gold Mining Trommels Parts.
  • Unisite Customized Coal Mining Machine Mining Equipment Gold Mining Trommels Parts.

Unisite Customized Coal Mining Machine Mining Equipment Gold Mining Trommels Parts.

After-sales Service: According to Design
Warranty: According to Design
Certification: CE, ISO 9001:2000, ISO 9001:2008
Standard: AISI, ASME, BS, ANSI, JIS, GB, GOST, ASTM, DIN
Surface Treatment: Polishing
Manufacturing Process: Casting
Customization:
Diamond Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Material
Carbon Steel
Transport Package
Wooden Box or Pallet
Trademark
unisite
Origin
China
Production Capacity
5000t Per Month

Product Description

Unisite Customized Coal Mining Machine Mining Equipment Gold Mining Trommels Parts.Unisite Customized Coal Mining Machine Mining Equipment Gold Mining Trommels Parts.
  MAIN PARTICULARS
Material for mould H13,DIEVAR,QDN,8407,2344V,TQ1,2343,SKD61,
45#steel,etc.
Heat treatment for mould Hardened, HRC50~55
Mould features Advanced design,   Logical structure,   High precision,   
Qualified materials, Long lifetime, Short delivery time.
Material for product Aluminum & Aluminum alloy  A356, A360, A380, A390, ADC-12,ADC10,Zinc & Zinc alloy. ZA-3,ZA-5,ZA-8,alloy steel,Nodular,Titanium.Zinc,zinc alloy,stainless steel.gray iron.ductile Iron.Brass.aluminum alloy.alloy steel,carbon steel,
 
Standard ASTM, ASME, DIN, JIS, ISO, BS, API, EN
Certificate ISO9001, CE, TUV, SGS or as your requirement to do test by the third party
Tolerance Up to +/- 0.002mm
Dimension As per customers' request
Processing Step1: Die Casting/sand casting/gravity casting
Step2: CNC turning, CNC turning and milling compound processing, 3/4/5 axis CNC milling, drilling, wire-cutting, EDM, grinding etc.
Step3: Surface treatment
Surface Anodize, Plating, Brushing, Polishing, Blackened, Powder coating, Sandblasting, Laser engraving, ED- Coating, Chromate Plating, Zinc Plating, Dacromat Coating, etc.
Marking as per clients' requirements
Inspection material, dimension, heat treatment, hardness, NDT, surface
Quality ISO9001, PPAP control production
Lead time 20-30days for sample, consult with customer for mass production
Delivery Express for sample, ocean shipping/air for mass production
Our Capabilities CNC machining, CNC center machining, drilling, milling, turning, grinding, tapping, die casting, casting, forging, stamping
Engineering&manufacturing services R&D process, tooling and gauging design, product design
Integrated CAD/CAM system, test and measuring
Packing Eco-friendly pp bag / EPE Foam /Carton boxes or wooden boxes
As customer's specific requirements
Others Recyclable, in line with environmental requirements and standards, and reliable

Unisite Customized Coal Mining Machine Mining Equipment Gold Mining Trommels Parts.
Unisite Customized Coal Mining Machine Mining Equipment Gold Mining Trommels Parts.


Unisite Customized Coal Mining Machine Mining Equipment Gold Mining Trommels Parts.
Unisite Customized Coal Mining Machine Mining Equipment Gold Mining Trommels Parts.


Unisite Customized Coal Mining Machine Mining Equipment Gold Mining Trommels Parts.Unisite Customized Coal Mining Machine Mining Equipment Gold Mining Trommels Parts.Unisite Customized Coal Mining Machine Mining Equipment Gold Mining Trommels Parts.Unisite Customized Coal Mining Machine Mining Equipment Gold Mining Trommels Parts.Unisite Customized Coal Mining Machine Mining Equipment Gold Mining Trommels Parts.Q:Are you a factory or trading company?
A: We are factory.
Q:What do I need for offering a quote?
A: Detailed drawings (PDF/STEP/IGS/DWG...) with material, quantity and surface treatment information.
Q:How about the MOQ?
A:MOQ depends on your need ,besides, we welcome trial order before mass-production.
Q:Can I get a quote without drawings?
A:Yes, we appreciate to receive your samples, pictures or drafts with detailed dimensions for accurate quotation.
Q:How long can I have the sample
A:Depends on your products and request, it usually takes 7-20days.
Q:Will my drawings be divulged if you benefit?
A: No, we pay much attention to protect our customers' privacy of drawings, signing NDA is also accepted if need.
Q:Is it possible to know how is my product going on without visiting our company?
A:We will offer a detailed products schedule and send weekly reports with pictures and videos
Q: How do you control the quality?
A:Material inspection--Check the material surface and roughly dimension.
Production first inspection--To ensure the critical dimension in mass production.
Sampling inspection--Check the quality before sending to the warehouse.
Final inspection--100% inspected before shipment.
Q: What will you do if we receive defective parts?
A: Please kindly send us the pictures, our engineers will find the solutions and remake them for you asap.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory
Registered Capital
1000000 RMB
Plant Area
>2000 square meters