After-sales Service: | 24 Hours |
---|---|
Warranty: | 12 Months |
Transport Package: | Wooden Case |
Trademark: | Saiter |
Origin: | China |
Customization: |
---|
Suppliers with verified business licenses
GB/T 18487.1-2015 | EV conduction charging system-Part 1: General requirements |
GB/T 20234.1-2015 | Connections for conduction charging of electric vehicles (Part 1: General Requirements) |
GB/T 20234.2-2015 | Connections for conduction charging of electric vehicles (Part 2: AC charging interface) |
NB/T 33008.2-2018 | Specification for inspection and testing of EV charging equipment- -Part 2: AC charging pile |
GB/T 34657.1-2017 | Specification for conducting charging interoperability testing for electric vehicles |
IEC61851-1 | International standard norme internationanlePart22:AC electric vehicle charging station |
IEC62196-2 | International standard norme internationanle Part2:Dimensional compatibility and interchangeability requirements for a.c. pin and contact-tube accessories |
QGDW 1592-2014 | Technical specification for inspection of AC charging pile for electric vehicles |
1. | Instrument and equipment cabinet structure, and electrical protection level is high, can be used in laboratory and factory test. | 4. | Prepare high power output load interface terminal, convenient to connect the program control resistor load, realize the system program control operation |
2. | The equipment includes charging pile connection confirmation test, charging stage test, charging preparation stage test, normal charging end test, switch S2 disconnection test, PE disconnection test, CP disconnect test, CP grounding test, etc | 5. | ST-HCAC + configuration complies with the national standard charging control guide circuit; ST-HCAC-EC configuration complies with the European standard charging control guide circuit; ST-HCAC + switch with PE, CP, CC can realize the simulation function of each fault state. |
3. | ST-HPAC-EU&US&JPN with PE, CP, PP each contact circuit switch, can realize the fault state simulation function; With computer display interface, the charging pile real-time voltage current, CP duty cycle, CP frequency, PP \ CC resistance, CP voltage, allowable charging current, rated cable current, charging state and other values display, easy to view; Guide device built-in acquisition function, range of 100A, to achieve voltage and current collection. | 6. | The equipment has the function of upper computer software, manually help realize the test of AC charging pile, and complete the test project. After the test completion, the test report can be generated and upload the data, which is convenient for users to view. |
Suppliers with verified business licenses