Production Scope: | Product Line |
---|---|
Condition: | New |
Automation: | Automatic |
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
NO | project | unit | Qty. | Note |
1 | lime | t/t | 1.1 | CaO:92% |
2 | semi-coke | t/t | 0.7 | Fixed carbon 80% |
3 | Electrode paste | t/t | 0.025 | |
4 | Electric furnace power consumption | kWh /t | ≤3200 | |
5 | Power electricity | kWh t/t | 150 |
transformer capacity |
3000KVA |
Primary side voltage |
11KV |
Secondary side voltage |
84~112(V) |
Secondary voltage level |
Level 8,differential:4V |
common voltage |
96(V) |
Secondary current |
21651(A) |
Diameter |
Φ600mm |
Polar circle diameter |
Φ1500mm±50mm |
Furnace diameter |
Φ3600(mm) |
Furnace shell diameter |
Φ4800mm |
Furnace depth |
1800mm |
Height of furnace shell |
3400mm |
Short smoke cover height |
1700mm |
electrode stroke |
1000mm |
Electrode lift speed |
0.5m/min |
Cooling water consumption |
180t/h |
No. | Name | Unit | Parameter | Remark |
1 | Furnace type | Unit set | Semi-closed low smoke hood | |
2 | Volume | KVA | 3000 | |
3 | Smoke volume of electric furnace and mine | m3/h | 40000 | Large cloth bag with positive pressure Dust collector |
Furnace fume volume | m3/h | 40000 | ||
Total industrial and mineral smoke volume | m3/h | 80000 | ||
Flue gas temperature |
ºC |
250-350 |
||
Dust system resistance |
4500 |
|||
Particle concentration |
<3 |
Total Number of Staffs | 585 | ||
Total Number of Managers | 40 | ||
Total Number of Technical Staffs | 160 | ||
Total Number of QC Staffs | 15 | ||
Total Number of workers | 310 | ||
Total Number of other staffs | 60 | ||
Contact person | Mr. Su | Position | President |
Tel | 0086-412-8554538 | Mobile | 0086-13700125807 |
Suppliers with verified business licenses