• Prefab Industrial Metal Structural Steel Frame Construction Processing Plant
  • Prefab Industrial Metal Structural Steel Frame Construction Processing Plant
  • Prefab Industrial Metal Structural Steel Frame Construction Processing Plant
  • Prefab Industrial Metal Structural Steel Frame Construction Processing Plant
  • Prefab Industrial Metal Structural Steel Frame Construction Processing Plant
  • Prefab Industrial Metal Structural Steel Frame Construction Processing Plant

Prefab Industrial Metal Structural Steel Frame Construction Processing Plant

Connection Form: Bolt Connection
Certification: CE, ISO
Material: Heavy Steel
Service: Design, Production, Installation
Life Span: >50 Years
Surface Treatment: Painting or Hot DIP Galvanized
Samples:
US$ 20/Square Meter 1 Square Meter(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
DRYC63-T
Type
Heavy Section Steel
Standard
GB, ASTM, DIN, JIS, AISI, BS
Trademark
Carbon Structural Steel, DRYC
Forming
Hot-Rolled Steel
Member
Steel Column
Type of Steel For Building Structure
H-Section Steel
Residential Wall Structure
Wall Support
Application
Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor, Steel Structure Bridge
After-sales Service
Dispatch Engineers or Online Technical Guidance
Warranty
1 Year
Carbon Structural Steel
Q235/Q355b
Transport Package
Standard Packing
Specification
Customized
Origin
Qingdao
HS Code
7308900000
Production Capacity
26, 000 Tons a Year

Product Description

 
Prefab Industrial Metal Structural Steel Frame Construction Processing Plant

ADVANTAGES:

(1) Free design and architectural drawings provided
(2) Durability, easy maintenance, designed life span for 50 years
(3) Fast and easy assemble, online installation guidance provided
(4) Elaborate and strong design, high wind ressistance performance
(5) Thermal and noise insulation, water proof and fire prevention
 
SPECIFICATIONS FOR STEEL STRUCTURE BUILDING
                                                                                                                                                                                                                                                Main Frame
column & beam
Q345 or Q235 welded H steel
tie bar
steel tube
bracing
round steel/angel steel
knee  brace
angle steel
strutting piece
round steel
casing pipe
steel tube
purlin
Glav. C/Z type
 
                                                                                                                                                                                                 Cladding System
roof panel
color steel sheet/sandwich panel
wall panel
color steel sheet/sandwich panel
doors
sandwich sliding door/rolling shutter door
windows
aluminum/PVC door
gutter
made of steel sheet/stainless steel
canopy
 
skylight
FRP 
 
                                                        Foundation 
anchor bolts
M24/27/30
ordinary bolts
M12/16/20
strength bolts
10.9S

Design Display
 
Prefab Industrial Metal Structural Steel Frame Construction Processing Plant
Prefab Industrial Metal Structural Steel Frame Construction Processing Plant
 
Prefab Industrial Metal Structural Steel Frame Construction Processing Plant
Prefab Industrial Metal Structural Steel Frame Construction Processing Plant


Material Display

Prefab Industrial Metal Structural Steel Frame Construction Processing Plant
Prefab Industrial Metal Structural Steel Frame Construction Processing Plant
Dingrui Yongcheng Steel Structure Co., Ltd. was established in 2014, integrating the design, manufacture and installation of steel structures. 

Our factory covers an area of more than 30,000 square meters, with a workshop area of 20,000 square meters. In the factory, there are 6 advanced production lines of
 H-beam, which can process up to 2,500 tons of new building materials per month. 

We also have the most advanced new-type building material equipment and intelligent new-type building material processing line in China. This intelligent production line can independently complete a series of processes such as straight strip division, transmission, assembly, welding, flipping, and straightening of steel, and truly realize production automation and mechanization.

Advanced Equipment

Prefab Industrial Metal Structural Steel Frame Construction Processing Plant
Prefab Industrial Metal Structural Steel Frame Construction Processing Plant
Prefab Industrial Metal Structural Steel Frame Construction Processing Plant
 
Prefab Industrial Metal Structural Steel Frame Construction Processing Plant
Prefab Industrial Metal Structural Steel Frame Construction Processing Plant
Prefab Industrial Metal Structural Steel Frame Construction Processing Plant
 
Prefab Industrial Metal Structural Steel Frame Construction Processing Plant
Prefab Industrial Metal Structural Steel Frame Construction Processing Plant
Prefab Industrial Metal Structural Steel Frame Construction Processing Plant

Steel structure is made up of steel materials and is a new type of building structure. The structure is mainly composed of steel beams, steel columns, steel trusses and other components made of H section steel and steel plate.

The joints between steel components is usually welded and bolted, Because it have character of lipht weightand easy construction, it is widely used for large factory,warehouse,workshop, stadiums,bridges and super highrise buildings.

 
Project Cases
 
Prefab Industrial Metal Structural Steel Frame Construction Processing Plant
The project is located in Suihua City, Heilongjiang Province, with an overall construction area of 28103 square meters, an actual construction area of 8748 square meters, 2016 tons of engineering steel, a construction period of 150 days, and completed in 2022. In the project construction, the 5-story and partially 6-story structures of the building are complex, resulting in a large amount of welding work.
Suihua Yuka Animal Husbandry Science and Technology Co., Ltd. is a wholly-owned subsidiary of Tieqilishi Group. The project undertaken by our company is located in Suihua, Heilongjiang Province, with an overall construction area of 8585 square meters, an actual construction area of 5213 square meters, 829 tons of engineering steel, a construction period of 120 days, and completed in 2020. The main workshop of this project has 6 floors and a building height of 39.15 meters.
Prefab Industrial Metal Structural Steel Frame Construction Processing Plant
Prefab Industrial Metal Structural Steel Frame Construction Processing Plant
The project of China Science Bohai Rim (Yantai) Pharmaceutical Advanced Research Institute is a scientific and technological innovation platform that Yantai City focuses on building. It is building a national high-end biomedical R&D integration platform around the whole chain of scientific and technological innovation, and building China's "Northern Medicine Valley" with significant international influence. Our company is responsible for the construction of buildings 1, 2, 3, 4, and 9 of this project, with a building area of 35210 square meters and an actual land area of 7036 square meters. The project uses 3485 tons of steel and will be completed in 2022.
Qinggang County Hanma Industrial Park is located in Suihua City, Heilongjiang Province, with a total planned infrastructure investment of 300 million yuan, mainly developing the whole industry chain enterprises in many fields, such as textile, paper making, health food, biomedicine, daily chemical industry, and new materials. The overall construction area of the project is 26150 square meters, and the actual construction area of the park is 25570 square meters. The project uses 1046 tons of steel, and the construction period is 180 days. It was completed in 2021.
Prefab Industrial Metal Structural Steel Frame Construction Processing Plant
 


FAQ

Q1: What are the benefits of steel construction?1-Durable and with long lifespan.2-Short construction period than concrete and wooden building. 3-Low cost and reusable.
4-High strength and light weight, has good seismic performance.
5-Widely used for multi-purpose buildings.
Light steel structure workshop, high rise hangar prefab steel warehouse prefabricated steel structures building

 

Q2: How can l get the quotation of the project
lf you have the drawing, we can offer you our quotation accordingly.
lf you have no design, our engineer will design for you to confirm. And then offer you a quotation.
prefabricated warehouse workshop building steel building warehouse
 
Q3: Do you provide samples?
Yes, we could offer the sample for free but do not pay for the cost of transportation.
prefabr warehous prefab steel structure building steel structure warehouse


Q4: What is your terms of payment?
L/C, T/T, and Western Union.
Light steel structure workshop, high rise hangar prefab steel warehouse prefabricated steel structures building


Q5: How about your quality control?
We have our own professional quality control team with rich experience and advanced inspection equipment.
prefabricated warehouse warehous hangar prefabr workshop workshop warehous


Q6: Can you provide the installation help?
We will provide detailed instruction photos and videos to you. If it is necessary,we will send professional engineers to do the construction guidance, and some skilled workers to help for installation.



Professional cast quality, integrity cast the future. Please feel free to CONTACT US.



 




 

 

 


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Registered Capital
1.48 Million USD
Plant Area
30220 square meters