After-sales Service: | Online Service |
---|---|
Warranty: | 1 Year |
Material: | Steel Structure |
Samples: |
---|
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
|
Q1: Are you a manufacturing factory or a trading company?
A: We are a manufacturing factory, Suzhou Anshiju Integrated Housing Technology Co., Ltd., located in Zhenze Town, Wujiang County, Suzhou City, Jiangsu Province. You are welcome to visit us at any time.
Q: What should I provide to build a prefab house?
A: Simply provide us with a sketch drawing or your requirements such as the area, usage, and stories of the house, and we will create an amazing design for you.
Q: How can I ensure the cost of building a prefab house?
A: Once the designing scheme is accepted and the building materials are confirmed, we will send you a detailed quotation.
Q: How long does it take to build a folding prefab house?
A: Generally, 2 workers can build a room in about 15 minutes with a crane.
Q: Is it difficult to build a prefab house?
A: Not at all, you can build the house independently following the construction drawings if you know how to use an electric tool.
Q: Can prefab houses be used in various buildings?
A: Yes, prefab houses can be used in hotels, offices, schools, entertainment clubs, light industrial workshops, and more.
Q: Are prefab houses stable?
A: Absolutely, our light steel prefab houses are safe even in extreme conditions like hurricanes and earthquakes.
Q: What are the advantages of prefab houses compared to traditional buildings?
A: Prefab houses offer better isolation of sound and heat, fireproof and anti-seismic properties, wind resistance, time and labor savings, more usable area, and excellent termite-proof capability.
Q: What is the delivery time?
A: Delivery time depends on order quantities, generally ranging from 5-15 days after receiving the deposit.
Suppliers with verified business licenses