• Manual Spacer Frame Bar Cutter in Insulating Glass Production Process
  • Manual Spacer Frame Bar Cutter in Insulating Glass Production Process
  • Manual Spacer Frame Bar Cutter in Insulating Glass Production Process
  • Manual Spacer Frame Bar Cutter in Insulating Glass Production Process

Manual Spacer Frame Bar Cutter in Insulating Glass Production Process

Type: Insulating Glass Production Line
Certification: CE, UL
Structure: Vertical
Control System: Manual Control
Condition: New
Transport Package: Seaworthy Package
Customization:
Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
LQJ02
Trademark
DETEK
Origin
China
HS Code
8464901900
Production Capacity
500sets/Year

Product Description

Aluminum Spacer Cutting Machine for Insulating Glass Production Line
Manual Spacer Frame Bar Cutter in Insulating Glass Production Process

Features
  1. Used for aluminum spacer bar cutting into size.
  2. Auto cutting blade for safety and high precision
  3. More than 1pcs cutting once for different thickness.
Parameter
Total power 380V 50HZ 0.25KW
Saw blade speed 3880r/min
Saw blade specification 150/1.2/170
Max. spacer width 100mm
Dimension 5000×1050×415mm
Weight 200Kg
Manual Spacer Frame Bar Cutter in Insulating Glass Production Process
Manual Spacer Frame Bar Cutter in Insulating Glass Production Process

Manual Spacer Frame Bar Cutter in Insulating Glass Production ProcessManual Spacer Frame Bar Cutter in Insulating Glass Production Process


Manual Spacer Frame Bar Cutter in Insulating Glass Production Process

Mostly asked questions below:

1. What is your soonest lead time?
  A: 60 days for whole production line, 30 days for single machine.  Special requirement pls check with sales.

2. How do you arrange the shipment?
  A: all machines fit GP for sea freight saving. Seaworthy package, workshop container loading, safe arriving.

3. Guarantee ?
  A: One-year guarantee (wearing parts are out of this range). Life long service. DETEK will send engineers for service upon request onsite.

4. How we can install the machines?
  A: Installation included; however, customers need to pay our engineer's round way air tickets, local transportation and accommodation (hotel and food).
The installation should be finished within 15 days, and will be charged 60USD/engineer/day.

5. How about the after service?
  A: Spare parts within 72 hours.
    Experienced technical sales sort out most of your questions.
Tens of service engineers ready for on-site service and instruction.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now