• MID Approval DIN Rail 3 Phase Energy Meter Based on En Standards
  • MID Approval DIN Rail 3 Phase Energy Meter Based on En Standards
  • MID Approval DIN Rail 3 Phase Energy Meter Based on En Standards
  • MID Approval DIN Rail 3 Phase Energy Meter Based on En Standards
  • MID Approval DIN Rail 3 Phase Energy Meter Based on En Standards
  • MID Approval DIN Rail 3 Phase Energy Meter Based on En Standards

MID Approval DIN Rail 3 Phase Energy Meter Based on En Standards

After-sales Service: 2 Years
Warranty: 2 Years
Display: Digital
Installation: Indirect Connected
Usage: Multi-Functional Energy Meter, Watt-Hour Meter, Meter for Industry and Home Use, Standard Electric Energy Meter, Reactive Energy Meter, Multi-rate Watt-hour Meters, Maximum Demand Meter
Electric Equipment: Three-phase Four-wire
Samples:
US$ 67/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2021

Suppliers with verified business licenses

Trading Company

Basic Info.

Model NO.
ADL400
Theory
Electronic Meter
Power Meter Connection
Terminal
Measured Signal
Pulse Peak
Type
Energy Meter
Certification
CE, MID
Customized
Customized
Acurracy
0.5
Input Current
5A by Cts or Input 10(80)a
Input Voltage
3X220/380V
Power Range
0-999999.99 Kwh
Frequency
50Hz or 60Hz
Communication
RS485 Modbus RTU
Certificate
CE,IEC,MID
Transport Package
Paper Carton
Specification
88.2*126.5*69.5mm
Trademark
ACREL
Origin
Jiangsu, China
HS Code
9028301400
Production Capacity
1000PCS/Week

Product Description

Product Description

ACREL din rail bi directional digital 3 phase energy meter

ACREL ADL400 3 phase din rail energy metering product with LCD is CE and MID approval, suitable for 110V, 120V, 220V, 230V,

240V AC low voltage system.ACREL ADL400 could be equivalent to Pilot PMAC903 , CET PMC-340 or Eastron SDM630MT 

It is with 0.5 accuracy,easy to install and perfectly match with your billing system.

It is widely used in kinds of control system, SCADA system and power management system.

ADL400 is MID approval and in accordance with EN 50470-3: 2006.


Functions and parameters
MID Approval DIN Rail 3 Phase Energy Meter Based on En Standards
Main functions of 3 phase energy power meter ADL400
6+2 digits LCD display,backlight (999999.99kwh)
Accuracy:0.2(voltage,current and frequency),0.5(active power,reactive power and power factor)
Input voltage:AC 3x220/380V
Input current:10(80)A or 5A by CTs

Frequency: 50hz or 60hz
In-built communication:RS485 modbus-RTU (C)
Pulse output
Optional functions:

*Multi-tariff energy(F) Max demand kWh and time happened
*2~31st Voltage and current harmonic(H) 

 
Data sheet
 
Voltage
Reference voltage
3×100V, 3×380V,3×57.7/100V, 3×220/380V
Consumption
<10VA
Impedance
>2MΩ
Accuracy
±0.2%
Current
Reference current
3×10(80)A or 3×1(6)A by current transformers
Accuracy class
Error±0.2%
Consumption
<1VA
Power
Active, reactive, apparent power,  class ±0.5℅
Display
LCD
Frequency
45~65Hz, class ±0.2%
 
Communication
RS485, Modbus-RTU protocol
Option Function
 
Multi tariff energy: Adapt 4 time zones, 2 time interval lists, 14 time interval by day and 4 tariff rates;Max demanded kWh and time happened;Frozen data on last 48 month,last 90 days;
     Harmonics:2~31ST Voltage and current harmonic
Operation Temperature
-10 ºC~+55 ºC
Storage Temperature
-40 ºC ~+70 ºC
Altitude
≤ 2000m
Relative humidity
≤95%RH, no condensation, without corrosive gas

Dimensions and Wirings
MID Approval DIN Rail 3 Phase Energy Meter Based on En Standards
MID Approval DIN Rail 3 Phase Energy Meter Based on En Standards
MID Approval DIN Rail 3 Phase Energy Meter Based on En Standards



Certifications

CE
MID Approval DIN Rail 3 Phase Energy Meter Based on En Standards
About ACREL


ACREL is a professional manufacturer with over 18 years experience in energy meters

MID Approval DIN Rail 3 Phase Energy Meter Based on En StandardsMID Approval DIN Rail 3 Phase Energy Meter Based on En Standards
MID Approval DIN Rail 3 Phase Energy Meter Based on En StandardsFAQ


Q:Where is your company located?
 
A:Our headquarter is in Shanghai, our factory locates in Jiangyin,Jiangsu Province,China.It takes about 1 hour by car from Shanghai Hongqiao International Airport to our factory. As it is low labor cost here in Jiangsu,we can offer a better price with high quality.

 
A:Our headquarter is in Shanghai, our factory locates in Jiangyin,Jiangsu Province,China.It takes about 1 hour by car from Shanghai Hongqiao International Airport to our factory. As it is low labor cost here in Jiangsu,we can offer a better price with high quality.
 
Q:What's your lead time?
 
A:Sample time 1-3days,mass production 10~20days for order more than 500pcs
 
Q:Payment terms?
 
A:Usually,TT,credit card,western union,in cash and so on.You can also choose to pay 30% as deposit and the balance before shipment or against copy of B/L if the order is large.
 
Q:Can other logo be put on your products(ODM)?

A:Yes,but MOQ for ODM will be at least 5pcs.We also need you provide logo Ai Format or EPS.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now