• Lianggong Building Material H20 Timber Beam for Formwork System
  • Lianggong Building Material H20 Timber Beam for Formwork System
  • Lianggong Building Material H20 Timber Beam for Formwork System
  • Lianggong Building Material H20 Timber Beam for Formwork System
  • Lianggong Building Material H20 Timber Beam for Formwork System
  • Lianggong Building Material H20 Timber Beam for Formwork System

Lianggong Building Material H20 Timber Beam for Formwork System

Certification: ISO9000
Material: Spruce
Type: Wall Formwork
Color: Yellow
Bending Resistant: 5kn*M
Shearing Resistant: 11kn
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Jiangsu, China
to see all verified strength labels (29)

Basic Info.

Model NO.
Timber beam
Transport Package
Standard Package
Specification
Customized
Trademark
LIANGGONG
Origin
China
Production Capacity
4000 Meters/Per Day

Product Description

Product Description

H20 Timber Beam

At present, we have a large-scale timber beam workshop and a first-class production line with daily output of over 4000m.
Products Show

Lianggong Building Material H20 Timber Beam for Formwork System
Specifications of H20Timber Beams:
Lianggong Building Material H20 Timber Beam for Formwork System
Timber beam lengthening
Standard holes can be punched on both ends of the timber beam. On project site, the timber beam can be lengthened as per need. We can also produce customer-made timber beams at any length.
Lianggong Building Material H20 Timber Beam for Formwork SystemTimber beam end protection
The timber beams is an important part of the formwork system and widely used in engineering projects.
In order to protect the timber beam from being damaged and extend the service life, we've designed the following four end caps for your choice.

Lianggong Building Material H20 Timber Beam for Formwork System
Packing & Delivery
Packing:
1.Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2.Different packages are used for different products: 
---Bundles:Timber beam, steel props, tie rod, etc. 
---Pallet:Small parts will be put in bags and then on pallets. 
---Wooden cases:It is available on customer's request. 
---Bulk:Some irregular goods will be loaded in bulk in container. 
Delivery: 
1.Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2.Transportation: It depends on the destination charge port. 
3.Negotiation is needed for special requirements.
Lianggong Building Material H20 Timber Beam for Formwork System
Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Lianggong Building Material H20 Timber Beam for Formwork System
 
Our Company
Lianggong Formwork Co.,Ltd. is one of the leading formwork and scaffolding companies headquartered in Nanjing City, China, with its factories located in Jianhu Economic Development Zone of Yancheng City, Jiangsu Province. As a well-established company in construction formwork field, Lianggong has been devoted itself and specialized in formwork and scaffolding research, development, manufacturing, and labor service. 

During the years of hardworking since 2010 by the whole company staff, Lianggong has successfully delivered and served a large number of projects at home and abroad, such as bridges, tunnels, power stations, and industrial & civil constructions. Major products of Lianggong include H20 timber beam, wall and column formwork, single-sided bracket, crane-lifted climbing formwork, hydraulic auto-climbing system, protection screen and unloading platform, shaft beam, table formwork, ring-lock scaffolding and stair tower, cantilever forming traveller and hydraulic tunnel lining trolley, etc. 

Utilizing its strong technical background and abundant engineering experience, and always bearing in mind to keep its cost-effectiveness and efficiency for clients, Lianggong will continue to be your best partner in any project from the very start and achieve higher and further goals together. 
 
Lianggong Building Material H20 Timber Beam for Formwork System
Lianggong Building Material H20 Timber Beam for Formwork System

Customer Photos
Lianggong Building Material H20 Timber Beam for Formwork System
Lianggong Building Material H20 Timber Beam for Formwork System
FAQ
Q1:Are you trading  or manufacturer? 
A:We are factory. 

Q2:What do you do? 
A:We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc. 

Q3:What can you do for us? 
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects. 
B:We sell our products to the contractors, building companies, material supplier or trading companies. 
C:We support our worldwide peer companies with our outstanding formwork or scaffolding products. 
D:We provide remote or on-site instruction to the builders. 

Q4:Do you provide samples? is it free or extra? 
A:Yes, we could offer the sample for free charge but do not pay the cost of freight. 

Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
 A:Structural drawing and section drawing.
 
Q6:How long does it take to make a brief design and quotation after we offer the structural drawing? 
A:In general, it takes 5~7 days based on specific requirements of construction project. 

Q7:How long dose it take to manufacture the products after the signing of contract?
 A:In general, it takes 30~60 days based on the type and quantity of products to be produced. 

Q8:What is your terms of payment? 
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
150
Year of Establishment
2010-08-25