Basic Info.
Feature
Antimagnetic, Easy Installation, Light Weight, Corrosion Resistance
Surface Treatment
Fire-Retardant Coating
Color
Yellow,White,Green,Silver
Side Rail Height
50-500mm
Transport Package
Shrink Film
Specification
specification sheet
Product Description
Insulated FRP Material Straight Ladder Cable Tray for Electric Wire
1. Product Description of the FRP Cable TrayCable tray system is made up of cable tray, cable tray bend, bracket, corbel, accessories etc. It used to support the cable in the process of installation and laying. Cable tray is divided into solid trough & cable trunking, cable ladder, ventilated & perforated trough, large span type etc.
Cable tray apply to construction industry, chemical factory, power projects etc widely.
FRP cable tray has high mechanical strength. It has both the rigidity of metal cable tray and toughness of grp cable tray, such as good corrosion resistance, strong ageing resistance, beautiful modelling, easy installation, long service life. Epoxy resin and epoxy resin composite fiberglass cable tray is suited for strong corrosion environment, large span and heavy load conditions.2. SpecificationItem | Type | B | H | Thickness of FRP | Thickness of Epoxy |
1 | DHQ-C
DHQ-T
DHQ-P | 100 | 50 | 3 | 1.5 |
2 | 100 | 3 |
3 | 150 | 100 | 3.5 |
4 | 150 | 3.5 |
5 | 200 | 100 | 4 |
6 | 150 | 4 |
7 | 200 | 4 |
8 | 300 | 100 | 4 |
9 | 150 | 4.5 | 1.5 |
10 | 200 | 4.5 |
11 | 400 | 100 | 4.5 |
12 | 150 | 5 |
13 | 200 | 5.5 |
14 | 500 | 100 | 5.5 |
15 | 150 | 6 | 1.5 |
16 | 200 | 6.5 |
17 | 600 | 100 | 6.5 |
18 | 150 | 7 |
19 | 200 | 7.5 |
20 | 800 | 100 | 7 |
21 | 150 | 7.5 |
22 | 200 | 8 |
Note: DHQ---Cable tray series; C---Channel type; T---Ladder type; P---Tray type; B---breadth(mm); H---Height(mm)3. Connection1. FRP Trough cable tray2. FRP Ladder cable tray
3. FRP Tray type cable tray4. Advantage1. Low cost, significant cost savings compared to standard traditional tray products.
2. Light in weight, wide range of sizes.
3. Fast heat dispersion.
4. Strong enough to withstand short circuits. Provides strength, rigidity without additional hardware.
5. Adapts to difficult architectural designs to accommodate changes in direction and elevation of cable runs.
6.Flexible, easy and fast installation. Design allows cable exit or entry at any point.
7. Cables can be secured to clamps or ties.
8.Various hardware accessories available to fix, support and install.
9. Safe smooth edge design to protect cable.
10.Easy for line check and cleaning , easy maintained.
5.ApplicationThe electric cable tray system are widely used for:1.railway bridge cables laying
2.highway bridge cables laying
3.petrochemical engineering cables laying
4.post and telecommunication cables laying
5.computer cables laying6.Installation Notice1. Each ends of cable trays should be connected by 6 holes when the height is 50- 100 mm; when their height is 150-220 mm, holes should be 12.
2. Support distance: it should not be more than the support distance and load capacity allowed by load curve.
3. Width of cable trays: some remarkable room should be served when you choosing the cable trays wi dth, in order to add cables in the near future.
4. Laying separately: when electric cables and controlling cables are few, they could be laid in the same c able tray, as long as they are laid separately by clapboard.
5. Fixing cables: when collecting cable trays are laid horizontally, connections among trays should be set on 1/4 of skip distance, horizontal cables should be fixed every 2 meters, and vertical cables should be fixed every 1.5 meters.
6. Cable trays device should have another grounding equipment.7. Packing & DeliveryPacking: Standard export package or according to client's requirement.8.FAQQ: Are you a trading company or a manufacture factory?
A:Manufacture.Our factory is one of the biggest FRP products, FRP machines manufacturer in China.
Q: I am interested in your products, could I get sample for free?
A: We can supply a few pieces FREE samples if we have some in stock, and you only need to pay the freight cost by yourself. If you have express account, we will send the samples by freight collected . Welcome to send your inquiry for FREE samples!
Q: How about the Delivery time?
A: 10-15days after receiving the deposit based on the MOQ. Normally, 30-35days to finish the order for a 20ft container. Welcome to ask for the detailed delivery time according to your order quantity!
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance T/T before shipment.
Address:
Unit 25, 9th Floor, Building 7, Section 4 No. 188, West Road of South Fourth Ring Road, Fengtai District, Beijing, China
Business Type:
Manufacturer/Factory, Trading Company
Business Range:
Chemicals, Construction & Decoration, Industrial Equipment & Components, Manufacturing & Processing Machinery, Metallurgy, Mineral & Energy, Service
Management System Certification:
ISO 9001, ISO 9000, ISO 14001, ISO 14000
Company Introduction:
Beijing Jijingyuan Environmental engineering Co., Ltd is a leading manufacturer and supplier for water treatment, FRP relative products and air conditioner. We serving both national and international markets. Our company has been providing quality products since established.
In our large product line we offer water treatment equipment and products. FRP/fiberglass/GRP products and machines(FRP pipe winding machine, FRP tank winding machine, FRP grating machine, FRP pultrusion machine. FRP pipe, FRP tank, FRP grating and all kinds of profiles), air conditioner ect. We procure quality raw material to make this assortment of products. Our products are also highly liked by our clients.
Our target is "excellent quality, honesty, innovation and shared interest. " Our products are popular in domestic and abroad because of high quality, high efficiency, reasonable price and honest, speedy and considerate service.