• Industrial Complete Fully Automatic Cola Soft Drink Beverage Water Filling Capping Sealing Machine High Technological Machine
  • Industrial Complete Fully Automatic Cola Soft Drink Beverage Water Filling Capping Sealing Machine High Technological Machine
  • Industrial Complete Fully Automatic Cola Soft Drink Beverage Water Filling Capping Sealing Machine High Technological Machine
  • Industrial Complete Fully Automatic Cola Soft Drink Beverage Water Filling Capping Sealing Machine High Technological Machine
  • Industrial Complete Fully Automatic Cola Soft Drink Beverage Water Filling Capping Sealing Machine High Technological Machine
  • Industrial Complete Fully Automatic Cola Soft Drink Beverage Water Filling Capping Sealing Machine High Technological Machine

Industrial Complete Fully Automatic Cola Soft Drink Beverage Water Filling Capping Sealing Machine High Technological Machine

After-sales Service: 1 Year
Warranty: 1 Years
Type: Volumetric Filling Machine
Automatic Grade: Automatic
Material Type: Liquid
Filling Valve Head: Multi-Head
Customization:
Diamond Member Since 2010

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
CGF series
Feed Cylinder Structure
Single-Room Feeding
Dosing Device
Capacity Cup
Filling Principle
Gravity
Packaging Container Lifting Structure
Pneumatic Lifting
Structure
Rotary
Packaging
Bottle
Packaging Material
Plastic
Machine
Machine to Make Soft Drinks
Certification
CE, SGS
PLC
Mitsubishi
Capacity
3000-5000b/H
Suitable Cap Shape
Plastic Screw Cap
Quality
High
Transport Package
Wooden Packages, Suitable for Long Way Distance
Specification
CE SGS ISO
Trademark
Beyond
Origin
China Jiangsu
HS Code
8422301090
Production Capacity
200 Sets/Year

Product Description

Industrial Complete Fully Automatic Cola Soft Drink Beverage Water Filling Capping Sealing Machine High Technological Machine


 
Characteristics- Carbonated Drinks Bottle Filling Line:

1. This carbonated drinks bottle filling line is used in production gas containing water of PET polyester bottle-packing carbonated beverage, 

2. The magnetic torque is used for screw capping., in order to assure capping quality.

3. The whole machine designing is reasonable, the appearance is beautiful and the maintenance is convenient.

4. It carries out washing bottle, filling and capping on one machine.

5. The main machine adopts advanced PLC control, Touch screen and no-bottle, no-cap system.

6. Adopting equal pressure filling principle and current spring valves in order to assure beverage quality.
 
Industrial Complete Fully Automatic Cola Soft Drink Beverage Water Filling Capping Sealing Machine High Technological Machine

7. It adopts bottle handing technology to make changing bottle more convenient, faster and easier.

Technical parameters
Model DCGF14-12-5 DCGF18-18-6 DCGF24-24-8 DCGF32-32-8 DCGF40-40-10
Production Capability
(500ml b/h)  
2000-3000 3000-5000 5000-8000 8000-12000 12000-16000
Filling precision ≤+5mm(Liquid Level)
Filling pressure
(Mpa)
≤0.4
PET bottle specification
(mm)
Bottle diameter:Ø50- Ø100;       Height:150-310
Suitable cap shape Plastic Screw Cap
Total Power(kw) 1.87 2.57 3.7 5.5 7.5
Weight(kg) 2600 3500 4650 6800 8500
Dimension (mm) 2300×1680×2650 2500×1760×2650 3100×2100×2650 3800×2800×2650 4000×3300×3400

Industrial Complete Fully Automatic Cola Soft Drink Beverage Water Filling Capping Sealing Machine High Technological MachineIndustrial Complete Fully Automatic Cola Soft Drink Beverage Water Filling Capping Sealing Machine High Technological MachineIndustrial Complete Fully Automatic Cola Soft Drink Beverage Water Filling Capping Sealing Machine High Technological MachineIndustrial Complete Fully Automatic Cola Soft Drink Beverage Water Filling Capping Sealing Machine High Technological MachineIndustrial Complete Fully Automatic Cola Soft Drink Beverage Water Filling Capping Sealing Machine High Technological MachineIndustrial Complete Fully Automatic Cola Soft Drink Beverage Water Filling Capping Sealing Machine High Technological Machine
Service Term

1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
 
While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days  . The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
 
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges  air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.
 
2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.

Commercial Terms
1. Warranty
All parts are under two Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.
 
2. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight
 

Industrial Complete Fully Automatic Cola Soft Drink Beverage Water Filling Capping Sealing Machine High Technological Machine


Industrial Complete Fully Automatic Cola Soft Drink Beverage Water Filling Capping Sealing Machine High Technological Machine
Industrial Complete Fully Automatic Cola Soft Drink Beverage Water Filling Capping Sealing Machine High Technological Machine
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now