Model LTS-XX | 271916 | 100A | 150A | 252A | 31.5B | 100B | 150B | 252B | 31.5C | 100C | 150C | 252C |
Structure | precooling box, preheating box, test box; two-box or three box selectable | |||||||||||
Valve device | Forced air valve device | |||||||||||
Inside material | SUS304 stainless steel | |||||||||||
Outside material | SUS304 stainless steel or cold rolled steel with power spraying. | |||||||||||
Test plate | Stainless steel plate | |||||||||||
Refrigerating system | Semi-hermetic double-stage compressor | |||||||||||
Cooling way | Water-cooled/Air Cooled | |||||||||||
Environmental temp. | 0ºC~+30ºC | |||||||||||
Preheating temp. | +60ºC~+180ºC | +60ºC~+180ºC | +60ºC~+180ºC | |||||||||
Precooling temp. | -10ºC~-55ºC | -10ºC~-65ºC | -10ºC~-80ºC | |||||||||
High temp. shock | +60ºC~+150ºC | +60ºC~+150ºC | +60ºC~+150ºC | |||||||||
low temp. shock | -10ºC~-40ºC | -10ºC~-50ºC | -10ºC~-60ºC | |||||||||
Temp. deviation | +2ºC | |||||||||||
Simulation load(kg) | 10 | 10 | 15 | 20 | 5 | 10 | 15 | 20 | 5 | 10 | 15 | 20 |
High temp.shock speed(3-box) | RTºC~+150ºC/5min | RTºC~+150ºC/5min | RTºC~+150ºC/5min | |||||||||
low temp.shock speed(3-box) | RTºC~-40ºC/5min | RTºC~-50ºC/5min | RTºC~-60ºC/5min | |||||||||
High temp.shock speed(2-box) | -40ºC~+150ºC/5min | -50ºC~+150ºC/5min | -60ºC~+150ºC/5min | |||||||||
Low temp.shock speed(2-box) | +150ºC~40ºC/5min | +150ºC~55ºC/5min | +150ºC~65ºC/5min | |||||||||
Preheating time(min) | 25 | 30 | 40 | 45 | 25 | 30 | 40 | 45 | 25 | 30 | 40 | 45 |
Precooling time(min) | 60 | 75 | 100 | 110 | 70 | 85 | 100 | 110 | 70 | 85 | 100 | 110 |
Temperature sensor | PT100 | |||||||||||
Controller | Program-controlled liquid crystal touch screen | |||||||||||
Setting range | -100ºC~200ºC/TI, E: OH OOM ~999H 59M/ CYCLE: 0 CYCLE~10000 CYCLE | |||||||||||
Resolution ratio | Temperature: 0.01ºC/time:1min | |||||||||||
Output method | PID+PWM+SSR control mode | |||||||||||
Additional feature | Air outlet and inlet perception inspection control/ RS-232 remote monitoring management system | |||||||||||
Safety device | 1.With no-fuse protection switch. | |||||||||||
2.Control system with phase sequence protection and low voltage electrical protection. | ||||||||||||
3. Over load protection device for refrigeration compressor | ||||||||||||
4.Refrigeration compressor high and low voltage protection switch. | ||||||||||||
5.With over-heat protection switch. | ||||||||||||
6.Refrigeration compressor over oil pressure protection. | ||||||||||||
7.Overload protection for circulation fan motor | ||||||||||||
Customized service | Welcome to Non-standard,Specail requirements,OEM/ODM orders. | |||||||||||
Details of model: | ||||||||||||
Model | Inside Dimension (W*D*H mm) | Power supply | Power/kw | Water tower | Water pipe diameter (the entry pressure of water) must not be less than 2kg | |||||||
271916 | 500*1550*500 | 380V, 3-phase, 43A | 35kw | 15 tons | 2 inches | |||||||
31.5B | 350*350*300 | 380V, 3-phase, 55A | 36.3kw | 10 tons | 2 inches | |||||||
31.5C | 350*350*300 | 380V, 3-phase, 62A | 40.9kw | 10 tons | 2 inches | |||||||
100A | 500*400*500 | 380V, 3-phase, 50A | 33kw | 10 tons | 2 inches | |||||||
100B | 500*400*500 | 380V, 3-phase, 55A | 36.3kw | 10 tons | 2 inches | |||||||
100C | 500*400*500 | 380V, 3-phase, 70A | 46.2kw | 20 tons | 2 1/2 inches | |||||||
150A | 600*500*500 | 380V, 3-phase, 55A | 36.3kw | 15 tons | 2 inches | |||||||
150B | 600*500*500 | 380V, 3-phase, 62A | 40.9kw | 15 tons | 2 inches | |||||||
150C | 600*500*500 | 380V, 3-phase, 74A | 48.8kw | 25 tons | 2 inches | |||||||
252A | 700*600*600 | 380V, 3-phase, 65A | 42.9kw | 15 tons | 2 inches | |||||||
252B | 700*600*600 | 380V, 3-phase, 73A | 48.2kw | 25 tons | 2 1/2 inches |
GJB 150.5A-2009 : test method of military equipment laboratory environment, temperature shock test | ||||||||||||
GJB150.5-86 temperature shock test. | ||||||||||||
GJB 360A-96 test method of electronic and electrical components 107 temperature shock test . | ||||||||||||
GB/T31485-2015 security requirement and test method of power battery designed for electromobile. | ||||||||||||
GB/T11158-2008 Technical conditions of high temperature test box. | ||||||||||||
GB/T10589-2008 Technical conditions of low temperature test box. | ||||||||||||
GB/T2423.1-2001 Test method of high temperature test box. | ||||||||||||
GB/T2423.2-2001 Test method of low temperature test box. | ||||||||||||
GB/T2423.22-2002 Temperature change test. |
Products with this tag will be sent out within 15 days after you place an order. For the specific sending time and delivery date, please consult the supplier.
*If the supplier with the above tags do not give you the according discount or service, you can click "Contact Us" to make a complaint. If what you said is true, our professional team will help you to handle this problem.
If you are using our website on PC, you can find us by this way:
Go down to the bottom of Made-in-China.com > Go to "Help" Section> Contact Us
If you are using our Made-in-China.com App, you can find us by this way:
My Account > Click setting section which is in the top right corner > Contact Us