After-sales Service: | 1 Year |
---|---|
Warranty: | 1 Year |
Lubrication Style: | Lubricated |
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
The machine is customized according to customer need, the specific price depends on the configuration requirements (gas composition, exhaust volume and pressure).quotation will be given according the specific parameters.
Hydrogen gas production compressor | |||||
parameter industry | hydrogen from natural gas | Hydrogen from coke oven gas | Chemical tail gas recovery | Fluorine alkali tail gas recovery | other |
Suction pressure MPa(G) | 0-0.5 | 0-0.2 | 0-1.0 | 0-0.1 | |
discharge pressureMPa(G) | 1.0-3.0 | 0.8-2.3 | 1.5-3.0 | 0.8-2.5 | |
capacity Nm3/min | 5-50 | 10-200 | 10-200 | 8-100 | |
Compression levels | 1-3 | 1-4 | 1-6 | 1-5 | 1-6 |
motor power(KW) | 30-2000 | ||||
skid mounted | skid mounted | ||||
Digital Analog Computing | yes | ||||
systolic algorithm | yes | ||||
Service Guarantee | Professional service team, 7X24 hours all day service |
Hydrogen filling compressor + hydrogen refueling station compressor | |||||
parameter industry | 45Mpahydrogen refueling station | 90Mpa hydrogen refueling station | Hydrogen tank truck | Hydrogen flushed into the bottle | High pressure hydrogen delivery |
Suction pressure MPa(G) | 3-20 | 10-30 | 0.8-3.0 | 0.1-30 | 0.8-3.0 |
discharge pressureMPa(G) | 45 | 90 | 20.0-22.20 | 15.0-20.0 | 5.2-20.0 |
capacity Nm3/min | 200-2000 | 100-1000 | 300-2000 | 10-800 | 100-1500 |
Compression levels | 1-2 | 1-2 | 1-3 | 1-2 | 1-2 |
motor power(KW) | 30-200 | 30-185 | 75-315 | 3-160 | 22-200 |
skid mounted | skid mounted | ||||
Digital Analog Computing | yes | ||||
Finite Element Analysis | yes | ||||
Service Guarantee | Professional service team, 7X24 hours all day service |
Technical training is divided into two parts: company training and on-site training.
1)Company training
Before the unit is delivered, that is during the unit assembly period, users will be provided with a one-week on-site training by the company. Provide local accommodation and transportation facilities, and provide free venues, teaching materials, equipment, tools, etc. required for training.
2) On-site training
During the installation and trial operation of the unit, on-site training will be conducted to teach the principles, structure, operation, maintenance, troubleshooting of common faults and other knowledge of the unit, so as to further become familiar with the various systems of the unit, so that the purchaser can independently and correctly operate the unit. Operation, maintenance and management.
Suppliers with verified business licenses