After-sales Service: | 90 Days |
---|---|
Warranty: | 90 Days |
Type: | Welded |
Technique: | Hot Rolled |
Material: | Carbon Steel |
Surface Treatment: | Galvanized |
Samples: |
---|
Customization: |
---|
Suppliers with verified business licenses
Standard
|
AiSi, ASTM, bs, DIN, GB, JIS
|
Grade
|
SPCC,SPCD,SPCE,ST12-15,DC01-06,Q195A-Q235A,Q195AF-Q235AF,
Q295A(B)-Q345A(B) |
Type
|
Pre-galvanized pipe/Hot dipped Galvaniezd Pipe/ERW Steel Pipe
|
Type of coating
|
Galvanized
|
Processing Service
|
Bending, Welding, Decoiling, Cutting, Punching
|
Thickness
|
0.5-20mm,as required by you
|
MOQ
|
1 Ton
|
Payment
|
30%TT for deposit, 70% balance before shipment or LC at sight
|
Delivery time
|
8-14 days after deposit
|
Galvanized steel pipe is divided into cold galvanized steel pipe, hot galvanized steel pipe, cold galvanized steel pipe has been banned, the latter is also advocated by the state can be used temporarily. In the 1960s and 1970s, the developed countries in the world began to develop new types of pipes and gradually banned galvanized pipes. China's Ministry of Construction and other four ministries and commissions have also issued a document to prohibit galvanized pipes as water supply pipes from 2000, the cold water pipes in the new community have rarely used galvanized pipes, and the hot water pipes in some communities use galvanized pipes. Hot-dip galvanized steel pipe has a wide range of applications in fire, power and highway.
Q1:Are you a manufacturer?
A:Yes, we are a manufacturer. We have our own factory in Tianjin, China. The company is a leader in the production and export of steel pipes, galvanized steel pipes, galvanized steel and PPGI sheet coils. We guarantee that we are all you need.
Q2:Can we visit your factory?
A:Warm welcome. We'll pick you up as soon as we know your itinerary.
Q3: Do you have quality control?
A:Yes, we have passed BV, SGS certification.
Q4:Can you arrange shipment?
A:Of course, we have regular freight forwarders who can get the best rates from most shipping companies and provide professional service.
Q5:What is your lead time?
A:If it's in stock, it's usually 7-14 days. Or 25-45 days, if the goods are not in stock, according to The number.
Q6:How can we get a quote?
A:Please provide the product specifications, such as material, size, shape, etc. That's how we can make the best offer.
Suppliers with verified business licenses