After-sales Service: | Available |
---|---|
Warranty: | 5 Years |
Certification: | CE, ISO |
Customized: | Customized |
Automatic Grade: | Automatic |
Type: | Vacuum Extrusion |
Customization: |
---|
Suppliers with verified business licenses
Our company's products include raw material feeding, mixing, crushing systems, hard plastic and semi-hard plastic
extruders, automatic brick cutting and transportation equipment, tunnel kilns , rotary kilns ,roller kiln, shuttle kiln etc.
Coal gangue | Shale | Hill soil |
River pond silt | Sludge | Construction waste |
Rotary kiln Section width | Capacity (pcs/day) Brick size: 240X115X53 mm |
5.6 m | 100,000~150,000 (Standard brick ) |
6.8 m | 150,000~200,000 (Standard brick ) |
8.8 m | 200,000~250,000 (Standard brick ) |
10.8m | 250,000~300,000 (Standard brick ) |
12.8 m | 300,000~400,000 (Standard brick ) |
16.8 m | 450,000~500,000 (Standard brick ) |
1.Drying and firing won't be influenced by weather condition.
2.Saving drying plastic cover costs compared with Hoffman or clamp kiln.
3.Saving labor costs ,only need 1 ~2 labors to operate the kiln.
4.Can get more finished bricks with more than 99.98% finished brick rate
5.Less maintenance costs without kiln cars compared with traditional tunnel kiln.
6.Saving energy compared with tunnel kiln ,energy consumption is 220 ~260 kcal/kg
7.Fuel:natural gas,coal,diesel oil,etc.
If your land is not big enough, you can consider building traditional tunnel kiln .
Tunnel inside width | Height of above kiln car surface |
Daily capacity | 10,000 brick firing fuel consumption |
3.5 m | 1.6~2 m | ≥110,000 pieces | < 49X 10^6 KJ |
4.6 m | 1.6~2 m | ≥150,000 pieces | < 49X 10^6 KJ |
7.0 m | 1.6~2 m | ≥200,000 pieces | < 49X 10^6 KJ |
8.8 m | 1.6~2 m | ≥300,000 pieces | < 49X 10^6 KJ |
12.8m | 1.6~2 m | ≥400,000 pieces | < 49X 10^6 KJ |
Zhengzhou Yingfeng Machinery Co., Ltd. predecessor ---- 33740 troops of the Chinese PLA Machinery Plant.From 1975
we have been committed to the complete sets of sintered brick equipment research and development, design, production
and sales.
Up to 2023.2 ,we have exported more than 40 countries with more than 500 brick production lines.
India, Bangladesh, Sri Lanka, Pakistan, Nepal, Indonesia, Vietnam, Malaysia, Afghanistan, Egypt, Yemen, Turkmenistan, Uzbekistan,Tajikistan, Kyrgyzstan, Russia, South Africa, Nigeria, Angola, Mozambique, Kenya, Rwanda, Congo, Ethiopia, Burundi, Guinea, Uganda, Libya, Zambia, Tanzania, Ghana, Peru, Mexico, Chile, Colombia, Argentina and others.
Our products enjoy 3 years warranty and life-long service.
Q: How much tunnel kiln ?
A: You can inform us your brick size,green brick weight,extruder capacity,green brick daily capacity,kiln car size etc.
Then we would make design for you and send you budget list.
Q: What is the fuel in kiln ?
A: Heavy oil, diesel oil, coal, gas etc.
Q: Can i only build dryer without kiln ?
A: No. Because usually dryer need energy to dry bricks, then go to kiln for firing. The drying energy is from kiln brick cooling stage.
Suppliers with verified business licenses