After-sales Service: | Online Service |
---|---|
Warranty: | / |
Type: | Pipe |
Samples: |
according to the customer′s requests
|
---|
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Item | Unit | Value | Test Method |
Density | g/cm3 | ≥1.42 | GB/T 1033.1 |
Tensile Strength | Mpa | ≥42 | GB/T 1040.2 |
Bending Strength | Mpa | ≥65 | GB/T 9341 |
Notched impact strength of barrel beam | KJ/M2 | ≥2.2 | GB/T 1043.1 |
Hardness | D/Shaw D | ≥79 | GB/T 2411 |
-When install shorter length, it is recommended to manually insert mallet and pile cap into the ground.
-When the installation is longer or the ground conditions are more difficult, it is recommended to use the pile hammer, can directly use the standard pneumatic hammer or light vibrator
-When the installation depth is above 4M or under harsh conditions, it is recommended to use the steel sheet pile with the same shape as the ecological sheet pile for construction. The support of the steel sheet pile can penetrate the hard soil quickly and speed up the installation.
Suppliers with verified business licenses