• Daf Sewage Treatment Plant, Slaughtering Sewage Purification Treatment
  • Daf Sewage Treatment Plant, Slaughtering Sewage Purification Treatment
  • Daf Sewage Treatment Plant, Slaughtering Sewage Purification Treatment
  • Daf Sewage Treatment Plant, Slaughtering Sewage Purification Treatment
  • Daf Sewage Treatment Plant, Slaughtering Sewage Purification Treatment
  • Daf Sewage Treatment Plant, Slaughtering Sewage Purification Treatment

Daf Sewage Treatment Plant, Slaughtering Sewage Purification Treatment

Type: Flotation Machine
Method: Combined Treatment
Usage: Industrial, Home, Agriculture, Hospital
Function: Wastewater Treatment
Advantage: High Efficiency Fine Bubbles
Chemicals: PAC+PAM
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2012

Suppliers with verified business licenses

Shandong, China
to see all verified strength labels (22)

Basic Info.

Model NO.
YW
Bubbles Type
Micro Bubbles
Voltage
Customized
Direction of Application
Mainly Industrial Wastewater
Feature
Low Consumption
Capacity
4-300m3/H
Color
Customized
Lifespan
10-20years
Transport Package
Seaworthy Package
Specification
carbon steel/stainless steel
Trademark
BETTER
Origin
Zhucheng, Shandong, China
HS Code
8421299090
Production Capacity
20 Sets/Month

Product Description

1. Description

YW series Dissolved Air Floatation is mainly for solid-liquid or liquid-liquid separation. Large sum of micro bubbles produced by dissolving and releasing system adhere to solid or liquid particles with same density as waste water to make the whole float to the surface thus achieve the aim of solid-liquid or liquid-liquid separation.

2. Application

(1) Remove oil and TSS.

(2) Separate small particles and algae in groundwater. 

(3) Recover valuable products in industrial sewage such as paper pulp.

(4) Act as secondary sedimentation tank to separate and concentrate suspended particles and sludge.

Daf Sewage Treatment Plant, Slaughtering Sewage Purification Treatment
3. Features

(1) Large capacity, high efficiency and small occupying space.

(2) Compact structure, easy operation and maintenance.

(3) Silt expansion elimination.

(5) Aerate to the water while air floating, it has an obvious effect to the elimination of active agent and foul smell in water. Meanwhile, the increased dissolved oxygen provides a favorable condition to the follow-up process.

(6) It can achieve the best effect in adopting this method when disposing the water with lower temperature, lower turbidity and more algae.

Suitable area:

slaughtering, starch, pharmaceuticals, papermaking, printing and dyeing, 

leather and tannery, petrochemical industry, domestic wastewater, etc.

4. Flow Process Diagram
Daf Sewage Treatment Plant, Slaughtering Sewage Purification Treatment

1. Clear water reservoir  2. Clear water pump  3. Control valve   4.5. Pressure gage  6. Dissolved gas tank
7. Control valve   8. Air compressor   9. Releaser   10. Foam scraper  11. Air floating pond 12. Water collecto
13. Jet device 14. Control valve  15. Dosing tank  16. Sewage pump   17. Flow meter   18. Sewage pond

5.Technical parameter: 

Specification Capacity (m3/h) Dissolved gas water
(m3/h)
Main dynamo power (kw) Foam scraper power
(kw)
Air compressor power
(kw)
Dissolved air tank size 
(mm)
Overall dimension  (mm)
YW-05 4-5 1.5-2 3 0.55 1.5 Φ400x1000 3300x1800x2200
YW-10 8-10 2-3 4 0.55 1.5 Φ500x1512 4000x2100x2200
YW-20 15-20 5-7 7.5 0.55 1.5 Φ500x1512 4600x2400x2200
YW-30 20-30 6-10 7.5 0.55 1.5 Φ500x1512 5200x2600x2400
YW-40 30-40 8-13 7.5 0.75 2.2 Φ600x1880 6000x2600x2400
YW-50 40-50 15-20 7.5 0.75 2.2 Φ600x1880 7000x2600x2400
YW-60 50-60 18-27 11 0.75 2.2 Φ600x1880 7600x2800x2400
YW-80 70-80 24-32 7.5 0.75 3 Φ650x2034 9200x2800x2400
YW-100 90-100 30-35 15 0.75 3 Φ700x1980 10000x2800x2600
YW-150 125-150 60-80 22 1.1 4 Φ800x1980 13500x2800x2600
YW-200 175-200 80-100 22 1.1 5.5 Φ800x2100 15800x2800x2600
YW-250 225-250 110-120 22 1.1 5.5 Φ800x2400 15200x3400x2600
YW-300 280-300 120-180 37 1.1 5.5 Φ1000x2900 19200x3400x2800
Daf Sewage Treatment Plant, Slaughtering Sewage Purification Treatment
Daf Sewage Treatment Plant, Slaughtering Sewage Purification Treatment
Daf Sewage Treatment Plant, Slaughtering Sewage Purification Treatment
Daf Sewage Treatment Plant, Slaughtering Sewage Purification Treatment
Daf Sewage Treatment Plant, Slaughtering Sewage Purification Treatment
 After-Sales Service
1.Warranty is 12 months from the time machine is fully installed. In this period, under normal operating conditions, if malfunction is caused by product quality, we will provide free repairs.

2,supplied warranty including:
(1)In warranty period, if malfunction is caused by design, produce etc. quality of product, we will provide free repairs;
(2)In half year after run testing, if accessories is with quality problem and be replaced, we supply 12 months warranty for new accessories;
(3)In 7~12 months after run testing, if accessories is with quality problem and be replaced, we supply 6 months warranty for new accessories;
(4) If malfunction is caused by wrong man-made operating or natural disaster etc., it is out of our warranty scope, but we can help to relieve malfunction, your esteemed company should pay for the charge;

3,if incinerator can not meet requirement of client, we must improve within a definite time.

4.If your company needs us to send engineers to the site to guide the installation of the incinerator, Engineers Guide Service Available:USD100/day engineer salary(The engineer's accommodation and round-trip air tickets are provided by your company.)

5,below items are free of charge we supply:
(1)after incinerator is finishing completed installation, we train operating staff for client free of charge.
A,Participate in installation and debugging of incinerator, know well for technology and structure, function of incinerator etc.
B,We supply operating and maintenance instructions.
C,We supply site operation training, and common trouble removal.

6,after warranty period, we supply lifelong maintenance service and spare parts supply, and charge cost price.

7,we supply complete technology consulting and after-sale service.

Daf Sewage Treatment Plant, Slaughtering Sewage Purification Treatment
Daf Sewage Treatment Plant, Slaughtering Sewage Purification Treatment
Daf Sewage Treatment Plant, Slaughtering Sewage Purification Treatment
FAQ

1.Q:Are you a factory or trading company?
  A: We are a factory, we have rich experience for manufacuring water processing equipment for more than 10 years.
 
2.Q:Where is your factory located? How can i visit there?
  A: Our factory is located in No.1137 Guanhai road , Zhucheng City, Shandong Province, China. It is about 2 hours from Qingdao airport. We can pick you up if you need, welcome to visit our factory.
 
3.Q: Do you have  minimum order quantity request?
  A: No minimum order, but it can get a discount if you order a large quantity.
 
4.Q: Do you have  certificates?
  A: Yes, we have ISO,SGS,CE certificate.
 
5.Q: Can you meet my special requirements for my products?
  A: Yes, we have a professional design team. We can provide drawings according to your requirements.

6. Q:How to buy your idea products?
   A:You can provide us your water sources, water quality, flow rate and ground area (connect us for more details).

7. Q:How to pay?
  A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.

8. Q:What is the delivery time?
  A: It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.

9. Q: How to pack the products?
  A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.

10. Q: How to keep your equipments from corrosion? 
    A: We use the world-famous paint, like SigmaCoatings,PainBow,etc. What's more, we paint strictly according to the standard process.

11. Q: How do you manufacture your equipment ?
    A:Our  machining technology  includes laser/plasma cutting, automatic welding,CNC cutting and bending.
 
12. Q:How to install after the equipments arriving destination? 
    A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now