• Customized Automation Front Loading Washing Machine Tub Assembly Line
  • Customized Automation Front Loading Washing Machine Tub Assembly Line
  • Customized Automation Front Loading Washing Machine Tub Assembly Line
  • Customized Automation Front Loading Washing Machine Tub Assembly Line

Customized Automation Front Loading Washing Machine Tub Assembly Line

Automation: Automation
After-sales Service: Negotiable
Warranty: 12 Months
Transmission Type: Flexible
Automatic Production Line: Assembly
Certification: ISO
Customization:
Gold Member Since 2022

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
  • Overview
  • Line Layout
  • Machine list of the whole line
  • Machine Details
  • Commercial Components
Overview

Basic Info.

Model NO.
WM-01-15
Flexible Production
Intelligent Manufacturing
Rhythm
Flow Production Line
Production Scope
Parts Production Line
Transport Package
Wooden Cases, Vacuum Packing, Anti-Rust Oil
Trademark
IDO
Origin
China

Product Description

Front Loading Washing Machine Drum Assembly Line by Wuxi IDO Technology
 

Line Layout

Customized Automation Front Loading Washing Machine Tub Assembly LineNotes:
1. Cycle: 25S/p
2. LABOR REQUIRED: 5 PERSONS
 

Customized Automation Front Loading Washing Machine Tub Assembly Line
Customized Automation Front Loading Washing Machine Tub Assembly Line
Customized Automation Front Loading Washing Machine Tub Assembly Line

 

Machine list of the whole line

ST1 Loading trolley ST12 Spider feeder
ST2 V-bending&lock-seaming ST13 Spider pre-asembling
ST3 Transfer ST14 Drum spider screwing 
ST4 Flanging ST15 Run-out measuring 
ST5 Lifter hole punching  ST16 lifter manual-screwing   
ST6 Mobile positioning platform ST17 Loading trolley
ST7 Back cover pre-asembling ST18 Precision cutting machine
ST8 Front  cover  pre-asembling ST19 Turning over machine
ST9 Seaming ST20 Plasma welding machine
ST10 Positioning platform ST21 Robot
ST11 Drum spider piercingDrum spider piercing ST22 Erickson testing Machine
 

Machine Details

Customized Automation Front Loading Washing Machine Tub Assembly Line
-ST 2  V-bending & lock-seaming
Main actions:
1. The sheet is pushed into the machine by the servo pushing mechanism for positioning.
2. Bending knives on both sides begin to punch for V-bending.
3. The arms act for sheet rolling, and the inner support holds the drum wrapper tightly.
4. Start lock-seaming and take out the drum wrapper after completion

Main structure:
1 Material positioning and clamping
     -Drive: Servo motor
     -Positioning datum: positioning block
2 V-shaped bending
     -Drive: hydraulic
     -Bending knife lifting: hydraulic + rail slider + guide column and bush
3 Rolling and lock-seaming
     - Rolling drive: cylinder
     - Tightening drive: servo + roller screw
     - Seaming drive: hydraulic + guide column and bush
Main parameters:
1. Blank thickness: 0.4-0.6mm (different thickness needs to switch the riveting die)
2. Material width: 300-500mm
3. Maximum tensile strength: 5500N/50mm (standard test method)
4. Production beat: 25s
 

 

ST4: Flanging
Main actions:

1. After the drum is placed on the support mold of the flanging machine, the support mold supports the drum tightly.
2. The supporting cylinder descends and the supporting mold rotates.
3. The flanging wheel group feeds for flanging, and returns after the flanging is completed.

Main structure:
1 Support mold
     -Tightening drive: cylinder
     -Tightening mechanism: connecting rod mechanism
2 Drum holder transverse
     -Rotation drive: geared motor
     -Actuator: sprocket and chain mechanism
3 Drum holder clamping
     -Clamp drive: cylinder

Main parameters:
1.Material thickness: 0.5mm, 0.6mm
2.Material width: 300-500mm
3.Drum Diameter: 490±0.5mm (can be customized)
4.Production cycle: 20s
Customized Automation Front Loading Washing Machine Tub Assembly Line
Customized Automation Front Loading Washing Machine Tub Assembly Line
ST9: Front cover, back cover, drum wrapper Seaming
Main actions:
1.The pre-assembled drum enters the profiling die of the spin seaming machine
2.The upper profiling die is lowered into the front cover.
3.Synchronous rotation up and down drives the drum to rotate, and the seaming wheel feeds for seaming operation.
4.After the spin seaming is completed, the upper profiling die returns back.

Main structure:
1 Upper and lower profiling die rotation
     -Drive: Servo
     -Actuating Mechanism: main shaft + bearing
2 Seaming wheel feed
     -Drive: Servo
     -Actuator: oil-free slide plate + slider

Main parameters:
1.Drum height: 200-500mm
2.Drum wrapper thickness: 0.4-0.6 (can be customized)
3.Drum Diameter: 490±0.5mm (can be customized)
4.Production cycle: 20s
ST11: Drum spider piercing
Main actions:
 
1.Put the drum wrapper into the profiling blocks for positioning.
2.The drum pressing mechanism moves down to the designated height.
3.The pericing mechanism starts work, after that, the drum pressing mechanism goes back.

Main structure:

1 Lift of drum pressing mechanism
     -Drive: servo motor
     -Mechanism: Linear module
2 Piercing
     -Drive: Hydraulic
     -Actuator: oil-free slide plate + slider

Main parameters:
 
1.Piercing diameter: 6-8mm
2.Sheet thickness: 0.4-0.6mm
3.Drum diameter: 490±0.5mm (can be customized)
4.Cycle: 15s
Customized Automation Front Loading Washing Machine Tub Assembly Line

 

Commercial Components

No. Name Brand
1 Servo motor Mitsubishi or Siemens
2 Gear motor SEW or Siemens
3 3-phase asynchronous motor Siemens
4 Touch screen Mitsubishi or Siemens
5 PLC Mitsubishi or Siemens
6 Pneumatic component SMC or FESTO
7 Hydraulic component REXROTH
8 Adhesive dispensing component Graco or Nordson
9 Inductive switch Omron or SICK or Keyence
10 Guide rail and sliders HIWIN or THK
11 Bearings NSK
12 Optical grating SICK
13 Robot ABB or KUKA
Customized Automation Front Loading Washing Machine Tub Assembly LineCustomized Automation Front Loading Washing Machine Tub Assembly LineCustomized Automation Front Loading Washing Machine Tub Assembly Line




 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2022

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
107
Year of Establishment
2014-12-29