Color: | Green, Clear |
---|---|
Material: | PE/Po |
Thickness: | 150micron/200micron |
Samples: |
---|
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
An important type of disease and insects control films is "UV-blocking" films, which absorb UV-radiation up to 380 nm, thus
achieving:
· Reduction of the population of whiteflies, taphids and other insects in greenhouses, thereby also reducing the viruses which are
vectored by these insects.
· Control of the spread of certain diseases (such as botrytis), by reducing the sporulation of the relevant pathogenic fungi.
· Reduction of "blackening" of red rose petals, thereby increasing their commercial value.
Product name
|
Greenhouse Poly Film
|
Type
|
Multi-Span Agricultural Greenhouses
|
Material
|
PE
|
Place of Origin
|
China
|
Brand Name
|
xinhe
|
Color
|
Transaprent
|
Size
|
Can be customized
|
Thickness
|
100-250 micron
|
Printing
|
Customized Printed
|
Length
|
According to requirement
|
Packing
|
Roll Packing
|
Model Number
|
5 Layer Blown Film
|
Advantage
|
UV Resistant
|
Function
|
Mositure Proof
|
Instruction for use
|
Greenhouse&Tunnel
|
Qingzhou Xinhe Greenhouse and Horticulture CO., Ltd. Is a professional manufacturer that designs and processes all kinds of greenhouse skeletons and supporting facilities, focusing on the design of greenhouses such as flower market greenhouses,greenhouses, aquatic products, livestock farming greenhouses, ecological restaurant greenhouses manufacture.
1. How long is the delivery time?
According to your greenhouse size and system, the delivery time is usually 10-40days.
2. How long is the warranty period?
Different parts have different warranty, usually the electric machine guarantee 1 year, the steel structure 5years, glass 1 year, sunshade net 2-3years, etc.
3. How to install greenhouse?
First we prepare the material and export.
After your customs clearing, we send 2-4 engineers or all workers to guide to install.
If you want to save money, we only send engineers, and you match local workers. If you think it is hard to do, we also can send engineers and workers to install for you.
4. When installing, what cost should we pay?
our engineers and workers visas and round-trip tickets, their foods and accommodation, their communication.
Suppliers with verified business licenses