PRODUCT INFORMATION
Product description |
drum roller |
Material |
Carbon Steel, Brass, Stainless steel,etc. |
Delivery |
5-20 working days depends on order quantity Within 5-7 days working day for Sample below 100 pcs ,10-15 days working day for large quantity. |
Surface
treatment |
Zinc plating, Anodization, nickel plating,etc. |
Processing equipment |
CNC lathe, grinding machine, automatic lathe machine, conventional lathe machine, milling machine, etc. |
Inspection equipment |
Projector ,slide caliper,micrometers, thread gauge etc. |
Tolerance |
±0.01mm |
QC system |
100% inspection before shipment |
Packing |
Standard export package, Carton, Wood pallet or as requirement |
Payment Terms |
30% T/T in advance, 70% balance before shipment, Please inform us when the payment made, so that we are able to arrange the carrier to pick up ASAP.We will arrange shipment in 5-7 days after receive the full payment based on the Sailing Date |
Country of Origin |
china(mainland) |
Main Export Markets |
North America, Eastern Europe, Mid East, Asia, Central/South America, etc |
Application |
Vehicle,Electronic components,Household,Hardware,etc |
PROCESS OF ORDER
1) you send us drawing or sample
2)we offer you our best price
3)if you can accept our offer,we make the sample and send it to you
4)you think the sample is good then place an order and pay us 30% deposit
5)we start to make the product
6)when the goods is done,we deliver it to you
7)you pay us the balance after you see the B/L copy
FAQ
Are you trading company or manufactures?
we are manufactures,our company was founded in 2010.
Do you have stocks?
All parts are custom design, Not in stock. we produce parts according to customer drawings or samples.
Can we order samples for testing?
of course,We focus on long-term cooperation, so the product quality is very rigorous.
How about the Delivery time?
it is according to customer order,Typically, 15 to 30 days.