Metal shredder, also known as shear shredder, reduces material size through shearing, tearing, and squeezing. Its main shaft is forged solid and tempered. The internal structure adopts a dense row moving blade structure and a hydraulic driven push plate forced feeding mechanism, which has strong crushing ability, stable performance, high efficiency, low temperature, and convenient operation. This shredder is widely used in waste plastics, waste rubber, cans, iron sheets, fabrics, waste paper, wood, and other large volume waste, providing high-quality and reliable equipment for the early crushing and volume reduction treatment of waste recycling in China.
1: Thickened movable knife has high crushing power. All the knives are cast with alloy Tool steel and wear-resistant die steel, which is solid and has a long service life.
2: The frame plate is thick and can withstand high torque, making it very sturdy.
3: Set up automatic reverse control functions for start, stop, reverse, and overload.
4: The equipment has the characteristics of low speed, high torque, low noise, and dust that can meet environmental standards.
5: Easy to adjust, low maintenance cost, economical and durable.
6: The thickness of the cutting tool and the number of claws can be changed according to different materials.
1. Bulk material → shredder → conveyor belt → crusher
2. After being crushed by a shredder, the volume of large plastic can generally be reduced by 40%, and some materials can even reach 60%.
Applicable material diversification |
Zhengzhou Fude Machinery Equipment Co, Ltd,Established in 2015,A factorythat integrates machine research, development, manufacturing, and sales,Main production: metal briquetting machines, wood crushers, and large andmedium-sized equipment for dryers.
Service tenet:Integrity based management, To ensure quality control,Satisfy both parties.
FAQ
Q:Are you a trading company or a manufacturing factory?
A:We are a factory.
Q:What is your delivery time?
A:If the goods are in stock, it usually takes 7-10 days.
If the goods are out of stock, it will take 15 to 30 days, calculated by quantity.
Q:What is your payment method?
A:30% of the total price should be paid in T/T as the down payment; 70% of the remaining payment should be paid in T/T before delivery.
Q:Do you provide technical guidance?
A:Yes, we will provide you with professional advice on the selection of models and the operation of equipment.