Weight: | 520kg |
---|---|
Warranty: | 10 Years |
Cycle Life: | 6000 Cycles |
Nominal Capacity: | 118.3kwh |
Protection Level: | IP65 |
The Module of Energy Density: | 211.5wh/Kg |
Customization: |
---|
Suppliers with verified business licenses
Product Description
537.6V Lifepo4 220Ah Electric Bus Batteries For Pure Electric Bus
voltage/Capacity | 537.6V/220Ah | ||
Total power | 118.3Kwh | ||
Configuration | 10P168S | ||
Charge | Max continuous current | ≤1C | |
Discharge | Max Instantaneous Current | ≤2C | |
Continuous Current | ≤1C | ||
Working Temp. Range | Discharge: -20ºC~45ºC | ||
Charge: 0ºC~45ºC | |||
Storage Temperature | -20~25ºC (3-6months, 50%SOC) | ||
-20~45ºC(1-3months, 50%SOC) | |||
-20~60ºC (within 1 month, 50%SOC) | |||
Relative Humidity | 5%~95% | ||
Charge retention | ≥95% | ||
Resistance | ≥20MΩ | ||
Cooling Method | Air cooling |
Lifepo4 battery cell performance :
Longer cycle life :more than 3000times under 1C discharge and charge rate 100%DOD
Soundon New Energy is invested by Sound Group and Hunan Chasing Financial. It's an enterprise engage in technology innovation, product design and marketing for battery cathode material and high capacity lithium-ion battery. Our products are widely used in public lives, military affairs, aviation and transportation, energy, communication and information etc. Soundon has lithium-ion cathode material department, lithium-ion battery department and electric vehicle department, each department is in independent operation.
Soundon New Energy has the ability of production 50,000 tons NCM&LiFePO4 battery Cathode material, 6 GWh high capacity li-ion battery every year.
Soundon New Energy industrial park now covers 2 milion , with the registered capital as USD 496.66 million and the total investment as USD 1.57 billion. Now We have 300 engineers covering the filed of cell designing, BMS, electrical engineering and structural designing. Soundon has passed ISO9000-2015, ISO14001-2015 and IATF16949-2016.
Time schedule | Battery Capacity /YEAR GWH |
Cathode material Capacity /YEAR (Ton) | |
First phase | Finished in 2012 | 6 Gwh (NMC and LFP pouch) |
50,000 |
Second phase | Finished in June 2016 | ||
Third phase | Finished in July 2018 | ||
Fourth phase | Plan (In Changsha) | 20 Gwh (LFP Prismatic) |
Suppliers with verified business licenses