Condition: | New |
---|---|
Certification: | CE, RoHS, GS, ISO9001 |
Standard: | DIN, ASTM, GOST, GB, JIS, ANSI, BS |
Customized: | Customized |
Material: | Metal |
Application: | Metal Recycling Machine, Metal Cutting Machine, Metal Straightening Machinery, Metal Spinning Machinery, Metal Processing Machinery Parts, Metal forging Machinery, Metal Engraving Machinery, Metal Drawing Machinery, Metal Coating Machinery, Metal Casting Machinery |
Samples: |
---|
Customization: |
---|
Suppliers with verified business licenses
Material & Temper | Aluminum Alloy ADC12 ,A380 |
Surface Treament | Mill-Finished, Powder Coating,Polishing, Brushing, etc. |
Colour | Shinning Polishing , powder coated as customer demand |
Film Standard | Powder coating: 60-120 μm |
Part Weight | from 3 g --- 20kgs |
Application | Industry fittings and Construction and Decoration. |
Casting Machine | 200-1200 tons |
Capability | Output 100 tons per month. |
New Moulds | Opening new mould about 30 days . |
Fabrication |
Die designing→Die making→Smelting&alloying→QC→Die casting→remove burrs →QC→Surface treatment→QC→Packing→QC→Shipping→After Sale Service |
Deep Processing | CNC / Cutting / Punching / Checking / Tapping / Drilling / Milling |
Certification | 1. ISO9001-2008/ISO 9001:2008; |
2. GB/T28001-2001(including all the standard of OHSAS18001:1999); | |
3. GB/T24001-2004/ISO 14001:2004; | |
4. GMC. | |
MOQ | As custimer's . Usually 10-12 tons for a 20'FT; 20-23 tons for a 40HQ. |
Free Samples | YES |
Payment | 1. T/T: 30% deposite, the balance will be paid before delivery; |
2. L/C: the balance irrevocable L/C at sight. | |
Delivery time | 1. 15 days production ; |
2. If opening mould, plus 10-20 days. | |
OEM | Available. |
Chemical Composition of Aluminum Alloy :
Alloy | Si | Fe | Cu | Mn | Mg | Zn | Ni | Sn | Al |
ADC12 | 9.6-12.0 | 0.3-0.6 | 3.0-3.5 | 0.3-0.5 | 0.2-0.3 | 0.6-0.9 | 0.2-0.5 | <0.3 | Al |
A380 | 7.5-9.5 | 1.3 | 3.0-4.0 | 0.5 | 0.1 | 3 | 0.5 | 0.35 | Al |
Products show
FAQ
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment 30%TT in advance. 70% T/T before shippment
My name card
Suppliers with verified business licenses