Certification: | CE, ISO |
---|---|
Place Style: | Horizontal |
Range of Applications: | Industrial |
Type: | Eaf |
Usage: | Steel Molding |
Fuel: | Gas |
Customization: |
---|
Suppliers with verified business licenses
SN | Item | Unit | Data | Remark |
1 | Type | LLP10000 | ||
2 | Quantity | set | 1 | |
3 | Filter bag | °C | ≤120 | |
4 | Bag material | Water and oil repellent polyester needle felt | ||
5 | Filter area | 10000 | ||
6 | Fume speed at filter | m/min | ≤1.2 | |
7 | Fume amount | m3/h | 600000 | |
8 | Filter bag size | mm | φ130×6000 | |
9 | Filter bag quantity | pcs. | 4100 | |
10 | Pulse vavle quantity | pcs. | 240 | |
11 | System resistance | Pa | <1500 | |
12 | Dust emission concentration | mg/ Nm3 | <50 | |
13 | Dust cleaning control | PLC | Pulse type, off line | |
14 | Dust room | nos. | 16 | |
15 | Dust removal mode | Mechanical conveyor |
SN | Item | Unit | Data | Remark |
1 | Fan model | Y4-73No25F (T) | ||
2 | Quantiy | set | 1 | |
3 | Fan delivery | m3/h | 600000 | |
4 | Fan aire pressure | Pa | 4200 | |
5 | Motor power | 1250kW | 10kV | |
6 | Quantiy | set | 1 | |
7 | Motor speed | rpm | 960 | |
8 | Protection class | IP44 |
SN | Item | Unit | Qty | Remark |
A | Mechanical part | |||
1 | Main fume pipeline | t | 150 | |
2 | Water cooled pipeline | m | 50 | For EAF |
3 | Water cooled pipeline | m | 30 | For LF |
4 | Pneumatic butterfly valve | set | 1 | |
5 | Air mixing valve | set | 1 | |
6 | EAF fan | set | 1 | |
7 | EAF motor | set | 1 | |
8 | Noise insulation & reduction part | set | 1 | |
9 | Fluid transmission couplier | set | 1 | |
10 | Bag type dust collector | t | 330 | |
11 | Air tank | set | 1 | 5m3 |
12 | Freeze dryer | set | 1 | 5m3 |
13 | Compressed air triplet set | set | 1 | |
14 | Pipeline fittings | set | 1 | |
15 | Air source treatment part | set | 1 | |
16 | Star dust unloader valve | set | 18 | DF300 |
17 | Screw dust conveyor | set | 2 | φ30/φ40 |
B | Electrical part | |||
1 | H.V. incoming panel | pc. | 1 | |
2 | H.V. breaker panel | pc. | 1 | |
3 | Liquid resistance starter panel | pc. | 1 | |
4 | HMI panel | pc. | 1 | |
5 | PLC panel | set | 1 | Siemens S7-300 |
6 | GGD panel | pcs. | 4 | |
7 | Field junction box | pc. | 4 | |
C | Others | |||
1 | Package, customs, doucments | 1 | ||
2 | Installation material | 1 | ||
3 | China transportation | 1 | ||
Total Price (FOB china port) |
1. | Pre sale service |
a. | make technical solution |
b. | send quotation, technical data sheet and drawing |
c. | prepare power transmission plan, testing plan and shipment plan |
2. | In sale service |
a. | supervise the manufacturing schedule totally in accordance with the plan |
b. | send photos to customer during every manufacturing process(hold point) |
c. | inform the customer one week before testing. |
3. | After sale service |
a. | installation and commissioning, training the workers |
b. | quick response within 12 hours any time |
c. | provide 12 months guarantee period normally. |
1. Q: | What is your delivery time ? |
A: | Depend on the type of transformer. |
2. Q: | What is your payment term? |
A: | 30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it. |
3. Q: | What kind of standard you follow? |
A: | IEC, ANSI, GB, etc |
4. Q: | What kind of supporting documentation you can provide normally |
A: | Quotation, outline drawing, manufacturing plan, quality control plan testing plan, financial report, type test report(KEMA, CESI),reference list, etc |
5. Q: | What is your normal warranty period? |
A: | 12 months after transformer operation. |
6. Q: | Can u do installation and commission in user's site? |
A: | Yes, we can send our installation team to user's country for service. |
7. Q: | Do you have any experience in this kind of transformer? |
A: | Yes, we can provide reference list for check. |
Suppliers with verified business licenses