Taizhou Huangyan Daelong Mold Co., LTD (Taizhou Huangyan Hengyuan Mold &Plastic factory) was established in July 1993.The company located at No.58Kangzhuang Road,Huangyan economic development zone,It's a professionaltechnology enterprise for High speed cap compression moulding machine,PETpreform mold and Cap mold ,There are more than 20 scientific and technicalpersonnel engaged in R&D and related scientific technological innovationactivities, 36 scientific and technological achievements have been formed throughindependent research and development, and 32 projects have been transformedby self-investment.Four types of high-tech products are formed: high-speed precisioninjection molding molds for PET preforms, precision injection molds for plasticbottle caps for flexible packaging, high-speed cap compression molds andhigh-speed cap compression molding machines.We have cooperated withdomestic famous brands such as C'estbon, Haitian Soy Sauce, Mengniu, Yili.Blue Moon, etc.Win the trust of customers and form a company's own brand.
THE MATERIAL OF THE MOLD |
Mould cavity |
Germany 2316 with HRC 42-45 |
Mould core |
Germany 2316 with HRC 45-48 |
Mould neck |
Germany 2316 with HRC 45-50 |
Valve Pin |
SKD51 from Japan with HRC 58-60 |
Valve Pin heat Isolation pad |
America Dupont can withstand 350 degrees temperature |
Hot runner nozzle |
America Beryllium copper with HRC 37 |
Mould manifold plate |
H13 from America with HRC 35-38 |
Mould other plate |
P20 |
Other Specification of the Mould |
Hot runner system |
Hot runner system is made by our own factory, But the spare parts of the Hot runner is from Germany Hotest |
PID controller |
Made by our own factory |
Guarantee for the Mould |
1 million shot times of 1 year |
Free spare parts of the mould |
Core set : 1set/ cavity: 1 Piece/ hot runner system: 1set/PID controller system: 1Set/ other easy broken spare parts for each 8cavities cap mould. |
The life of the mould |
5-6years , Even in 10 years in good maintenance |
Installation & Commission |
Our technician can be the buyer' s factory to install and run the mould. But the buyer should bear all the cost for the technician' s trip(include the air ticket, the cost of the accommodation and the salary) |