• 3 Layers Tensionless Fabric Drying Machine for Textile Finishing
  • 3 Layers Tensionless Fabric Drying Machine for Textile Finishing
  • 3 Layers Tensionless Fabric Drying Machine for Textile Finishing
  • 3 Layers Tensionless Fabric Drying Machine for Textile Finishing
  • 3 Layers Tensionless Fabric Drying Machine for Textile Finishing
  • 3 Layers Tensionless Fabric Drying Machine for Textile Finishing

3 Layers Tensionless Fabric Drying Machine for Textile Finishing

Automatic Grade: Automatic
Working Width: 2m,2.4m,2.8m,3.2m,3.6m
Material: All Fabric
Voltage: 380V
Load Capacity: >2000kg
Certification: CE, ISO9001: 2000
Customization:
Gold Member Since 2017

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
FSHG2800
Warranty
1 Year
Customized
Customized
Condition
New
Transport Package
Export Standard
Trademark
FINESTART
Origin
China
HS Code
84518000
Production Capacity
50units/Year

Product Description

 
3 Layers Tensionless Fabric Drying Machine for Textile Finishing


Introduction
The drying machine is used for drying cylinder and open-width fabric with three-layer belt. Because of circulating drying and run under different speed, the fabric could keep in loosen circumstance without any tension during the drying process.
We provide corresponding machine according to different types of fabric to meet your requirements totally.
Based on the different width of belt, we could supply different models as following:
 FSHG-2000mm/2400mm/2800mm/3200mm(standard)/3600 mm
Based on the different heat sources, we could supply the following models with six heating methods:
1. Steam (0.8MPa)
2. Steam (2.8MPa)
3. Heat conduction oil
4.Gas (direct combustion) 
5.
Gas (indirectly) 6. Biofuels
Our machines are equipped with conveyor belt made of Teflon material, it could bear high temperature and not pollute the fabric with non-staining.
 
3 Layers Tensionless Fabric Drying Machine for Textile Finishing

Payment Terms
Payment Conditions30% down payment by T/T and the balance payment should be T/T or in irrevocable L/C at sight. 
Delivery time:30-60 days from the date of receiving down payment. All payment should be received before delivery in China.
 
Any questions and requirments,contact us now!



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now