• 1 1/4" Two Bolts Three Bolts Manual Polish Rod Clamp 40ton
  • 1 1/4" Two Bolts Three Bolts Manual Polish Rod Clamp 40ton
  • 1 1/4" Two Bolts Three Bolts Manual Polish Rod Clamp 40ton
  • 1 1/4" Two Bolts Three Bolts Manual Polish Rod Clamp 40ton
  • 1 1/4" Two Bolts Three Bolts Manual Polish Rod Clamp 40ton
  • 1 1/4" Two Bolts Three Bolts Manual Polish Rod Clamp 40ton

1 1/4" Two Bolts Three Bolts Manual Polish Rod Clamp 40ton

Warranty: 18 Month
Manufacturing Process: Forging
Surface Treatment: Spray-Paint
Samples:
US$ 99/Piece 1 Piece(Min.Order)
| Order Sample
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
1 1/4" Two Bolts Three Bolts Manual Polish Rod Clamp 40ton pictures & photos
1 1/4" Two Bolts Three Bolts Manual Polish Rod Clamp 40ton
US $59 / Piece
Min. Order: 1 Piece
Gold Member Since 2021

Suppliers with verified business licenses

Secured Trading Service
Rating: 5.0/5
Shandong, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Multi-language Pioneer
2 languages freely used by foreign trade staff. include: English, Russian
In-stock Capacity
The supplier has In-stock capacity
Fast Delivery
The supplier can deliver the goods within 15 days
to see all verified strength labels (14)
  • Overview
  • Product Description
Overview

Basic Info.

Model NO.
Manual Polish clamp
Operation Pressure
Atmospheric Pressure
Material
Alloy
Bolts
2-3 Bolt
Color
Blue Red Color
Name
Two Bolts Three Bolts Manual Polish Clamp
Weight
30kg
Model
1 1/4" Two Bolts Three Bolts Manual Polish Rod Cla
Transport Package
Woodern Box
Specification
7/8" 1 1/4"
Trademark
SEACOC
Origin
China

Packaging & Delivery

Package Size
40.00cm * 40.00cm * 50.00cm
Package Gross Weight
30.000kg

Product Description

1 1/4" Two Bolts Three Bolts Manual Polish Rod Clamp 40ton1 1/4" Two Bolts Three Bolts Manual Polish rod Clamp 40ton
 
Product Description

 

Two Bolts Three Bolts Manual Polish clamp 

Operation manual of
Manual Polish clamp

1. The specification for installing the polished rod clamp must be consistent with the nominal value of polished rod.
2. Install according to the mark ↑ on the polished rod Clamp. Do not install it reversely.
3. Wipe the clamped position clean.
4. Tighten the fastening nut, torque force ≥ 280n, M.
5. During the installation of the polished rod Clamp, it is absolutely not allowed to operate in violation of regulations, and it is strictly prohibited to put both hands on the upper and lower sides of the polished rod Clamp.
6. After installation, brake to slow down the smooth rod clamp and slowly load it to avoid unnecessary damage caused by excessive impact load of the smooth rod clamp.1 1/4" Two Bolts Three Bolts Manual Polish Rod Clamp 40ton1 1/4" Two Bolts Three Bolts Manual Polish Rod Clamp 40ton1 1/4" Two Bolts Three Bolts Manual Polish Rod Clamp 40ton1 1/4" Two Bolts Three Bolts Manual Polish Rod Clamp 40ton
Executive standard: SY / T 5029-2013  API 11
The product drawings are as follow
1 1/4" Two Bolts Three Bolts Manual Polish Rod Clamp 40ton
FAQ
Q: How can I place order?
A:You can contact us by email  about your order details, or place order on line
Q: How can l pay you?
A:After you confrm our Pl, we will request you to pay.T/T (HSBC bank) and Paypal,
Western Union are the most usual ways we are using
Q: What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an
Pl for your confirmation.You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been fnished,we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
Q:How do you take care when your clients received defective products?
A:replacement. If there are some defective items, we usually credit to our customer
or replace in next shipment.
Q: How do you check all the goods in the production line?
A:We have spot inspection and finished product inspection.
We check the goods when they go into next step production procedure.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now