Foshan Bingcheng Steel Frame House. Co., Ltd.

More
R&D Capacity:Own Brand, OEM, ODM
Main Products:Steel Frame Building, Prefab House, Light Steel Warehouse/Garage
{"app": "App", "root": "#root", "props": "#ssrData", "options": {"type":"react","main":false,"router":"none","base":"","path":"","csr":false}}
Info marked by "" is verified by SGS. Click here to view the full report.

Company Overview

Foshan Bingcheng Steel Frame House Co., Ltd.

Foshan Bingcheng Steel Frame House Co., Ltd. is a professional enterprise specializing in the design, manufacturing, marketing, and construction of steel structure and modular buildings. Founded in 2008 and located in Shishan Town, Nanhai District, Foshan City, we integrate R&D, production, sales, and installation into one, offering comprehensive building solutions worldwide.

Our product range includes K-type and T-type prefab houses, container houses, security booths, light steel villas, warehouses, industrial workshops, and insulated sandwich panels with various core materials such as Rock Wool, Magnesium Oxide, Paper Honeycomb, Aluminum Honeycomb, PU, and EPS.

We own advanced sandwich panel production lines and steel structure processing equipment, with a factory area of nearly 10, 000 m² And over 120 employees, among which 20% are engineers, designers, and technical specialists. This enables us to achieve an annual production capacity exceeding 1, 000, 000 m² .

Bingcheng has successfully delivered steel structure warehouses, workshops, and modular building projects in Oman, Saudi Arabia, UAE, Malaysia, Australia, Kenya and more than 50+ countries and regions worldwide, covering Asia, Africa, the Middle East, Oceania, Europe, and the Americas.

We provide complete solutions - from design, production, packing, and shipping to on-site installation guidance - ensuring buildings meet international standards for wind load, snow load, and local regulations.

Adhering to the principle of "Credibility First, Quality Foremost, Customer Satisfaction Above All", we are committed to innovation, reliability, and efficiency, and aim to build long-term partnerships with clients around the globe.

Bingcheng - Building for the World.

Member Info

Steel Frame Building, Prefab House, Light Steel Warehouse/Garage
ISO9001:2015
80%~100%
Zoumaying, Xiaotang, Shishan, Nanhai District, Foshan, Guangdong, China
South America, Southeast Asia, Africa
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month
true
Secured Trading Service

General Information

Steel Frame Building, Prefab House, Light Steel Warehouse/Garage
ISO9001:2015
80%~100%
Zoumaying, Xiaotang, Shishan, Nanhai District, Foshan, Guangdong, China

Trade Capacity

South America, Southeast Asia, Africa
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month

R&D Capacity

Yes
Yes
Yes