• Wall Formwork Water Barrier to Prevent Water Leakage
  • Wall Formwork Water Barrier to Prevent Water Leakage
  • Wall Formwork Water Barrier to Prevent Water Leakage
  • Wall Formwork Water Barrier to Prevent Water Leakage
  • Wall Formwork Water Barrier to Prevent Water Leakage
  • Wall Formwork Water Barrier to Prevent Water Leakage

Wall Formwork Water Barrier to Prevent Water Leakage

After-sales Service: Yes
Warranty: Yes
Application: Formwork
Surface Treatment: Yes
Technics: Casting
Material: Steel
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Gold Member Since 2016

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
water barrier
Type
Water Stop
Finishing
Natural Colour, Galvanized
Weight
0.44kg, 0.56kg
Size
L=110mm
Transport Package
Pallet
Specification
Dia 15/17mm
Trademark
HORIZON
Origin
China
HS Code
7308400000
Production Capacity
200 Tons / Month

Product Description

Wall Formwork Water Barrier to Prevent Water Leakage

Water stop connectors are used in water retaining structures. Cast into the concrete wall between two separate tie bars. After pouring, tie rods are removed, the water stop remains in situ. Allow two reducers per water stop.

This type of water stop is made from cast iron as one unit, which is the most cost-effective solution. To prevent the entering of concrete grout, a reducing sleeve will be installed at the transition from the water stop nut to the plastic tube.

Water stop Bar Ø(mm) Length (mm) Plate/Spigot (mm) Weight (kg)
D15L 15 110 60/26 0.43
D15W 15 110 65/26 0.55
D20 20 160 80/31 1.26
To prevent water seeping alongside the thread bar.
The spigot size for tubes inner dia 26mm or 31mm.
Cast, self-color or galvanized; Customized size available.
Wall Formwork Water Barrier to Prevent Water LeakageWall Formwork Water Barrier to Prevent Water LeakageWall Formwork Water Barrier to Prevent Water Leakage
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products: 
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.

Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements. 

Who we are: 
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects. 

What we offer: 
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc. 
On-site supervising support is available on request. 

Why us: 
With 10 years of experience, we know exactly what you need; 
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request. 
Prompt action on customer's requirments. 

We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients. 

HORIZON FORMWORK, your reliable formwork partner! 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now