Product Description
Vertical Tube Furnace with Muti Heating Zone & Vacuum Flanges
Vertical Tube Furnace with vacuum tube, which can achieve faster sample heating and quenching in vacuum or flowing gas. Precision temperature controller can provide 30 segments heating and cooling steps with +/- 1 C accuracy. It is ideal furnace for making quenching test and temperature measurement.
Specifications |
Furnace casing(N/A) | Double layer steel structure with air cooling. Built in thermostat to control Cooling fans running when case temperature > 55oC |
Voltage(V) | AC 208-240 Single Phase, 50/60 Hz |
Max. Heating Rate(ºC/min) | ≤ 20 |
Tube Size and Materials(mm) | custom made |
Temperature controller | PID automatic control via current limiting phase angle fired the resistor with 30 steps programmable |
Temperature Accuracy(ºC) | +/- 1 |
Vacuum Seal | Two stainless steel flanges with vacuum gauge and valves included A hook ring is welded inside of top flange for hanging thermal block or crucible by wire |
Our Company
Henan Synthe Corporation was founded in January 2013, as a separate and independent company to better serve its customers. SYNTHE was engaged in the design, development, manufacture, and sales of high-temperature insulation, vacuum-formed ceramic fiber heaters, diffusion heaters, and high-quality thermal processing equipment, all custom designed to meet your thermal requirements. Our products are used around the world in the most demanding heat treatment, lab thermal furnaces, dental, photovoltaic solar, semiconductor and environmental protection applications, temperature ranges from room temperature 20°C ( 68°F) to 1800°C ( 3272°F). For over ten years in the industry, we have been a problem-solver working with our customers to resolve their thermal management problems.
Package and shipping
Packing
In order to ensure the customer receive the furnace and accessories without any damage, we packed the furnace in three layers.
First, the furnace is wrapped by clear plastic paper, then filled the gap by polyfoam. Finally, it is packed by wooden box.
Shipping
1.By courier, like DHL,UPS,FEDEX,etc. it usually takes 3-4 days to arrive.
2.By air to the air port, it usually takes 5-7 days to arrive.
3.By sea to sea port, it usually takes 15-30 days to arrive.
4.If your delivery time is very urgent, we suggest you to choose by courier or by air.
5.If it not very urgent,we will suggest you to choose by sea,it is very cheap.
FAQ
1.Is your company accepting customization?
We have our own factory and excellent technical team, and we accept OEM service.2.We are not professional for operation and installation of your machine?
While it is not a stumbling block,our machine is easy to operate, no need to be professional,and the instruction manual and video sent to you are enough.What's more,we have professional engineers and they can solve all questions.
3. Which shipment is available?
By sea, by air , by express or as your requirement.
4.Do you inspect the finished products?
Yes,each step of production and finished products will be carried out inspection by QC department before shipping.