• Vertical Multistage Fire Water Pump
  • Vertical Multistage Fire Water Pump
  • Vertical Multistage Fire Water Pump
  • Vertical Multistage Fire Water Pump
  • Vertical Multistage Fire Water Pump

Vertical Multistage Fire Water Pump

Main Advantage: Xbd-Gdl Vertical Multistage Fire Pump
Type: Self-Starting Diesel Generator
Installation Method: Portable
Stroke: Four Stroke
Cooling Method: Water Cooling
Output Type: AC Single Phase
Samples:
US$ 400/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2014

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
XBD5.0/5G-QDL
Transport Package
Wood Box
Specification
CE
Trademark
Liansheng or OEM
Origin
Shanghai, China
HS Code
84101330
Production Capacity
20000

Product Description


Vertical Multistage Fire Water Pump
Products Name:Vertical Multistage Fire water pump

XBD series fire pump is our company according to the requirements of the actual needs of the market for fire pump and its special use, development of new fire protection product development in strict accordance with the new "GB6245-2006" standard of fire pump. By the national fire equipment quality supervision and testing center of detection, the performance indicators have reached or exceeded the standard requirements, and obtained the national fire products certification.

Use:

1. Fire hydrant fixed fire protection system of XBD series fire pump is mainly used for various enterprises and institutions, engineering construction, high-rise buildings and fire extinguishing system, automatic sprinkler system.
2. It can deliver 100 Degrees Celsius not containing solid particles of water and physical and chemical properties similar to water medium.
3. It can be used for fire fighting, life, production sharing water supply system and construction, municipal water supply and drainage.
Installation instructions
1, the weight of pipe shall not be installed in the pump body, otherwise easy to damage the pump;
2, pump and motor are the overall structure, the factory has been corrected by manufacturers, so the installation does not need to be adjusted, so the installation is very convenient;
3, the installation must tighten the anchor bolts, and every certain time to pump check to prevent it from loosening, violent vibration and impact on pump performance in order to avoid the pump start;
4, in order to maintain convenient and safe use, a regulating valve and a pressure gauge installed near the outlet installed in the export pipeline pump, for the high lift pump, in order to prevent water hammer, should also be a check valve installed in the outlet valve to prevent a sudden power failure, before the loss of power accident, so as to ensure the pump run in the best condition;
5, for a suction pump applications, shall be fitted with a valve, and the inlet pipe should not be too many corners, and there shall be no leakage Water Leakage phenomenon, so as not to affect the suction pump capacity;
6, in order not to make the impurities into the pump and plug flow affects the performance, the pump inlet filter should be installed in the front;
7, should be regularly (usually 15 days) trial operation of pump, the running time is about 1 hours, in order to prevent emergency axle card death cannot run...

Instructions for use

Before the start of:

1, hand rotation coupling, rotor parts should be no blocking phenomenon.
2, open the inlet valve, the exhaust valve so that the water filled in the pump cavity, then close vent valve;
3, to move the motor, determine the shift is correct;

Operation:

1, open the inlet valve, close the outlet pipeline valve.
2, switch on the power, when the pump speed to normal, re export pipeline valve is opened, and adjust to the desired operating point;
3, to observe the pump running any abnormal situation, such as the abnormal situation should immediately stop checking, treatment after operation;
Stop the car:
1, gradually close the exit valve, cut off the power supply;
2, close the inlet valve;
3, such as the environment temperature is below 0 Centigrade, should take measures to keep warm.
fault phenomenon failure cause elimination methods
  1.No power supply or one or two phase power supply is needed
Check all phases of power supply and restore power supply

 
  2.Poor contact of ac contactor and burning of coil
Repair or replace contactors

 
can not start 3.
The power switch is not closed, malfunction or damaged

 
Close the switch and replace it if the power indicator does not turn on
  4.
Thermal relay trip or damage

 
Check whether the motor is blocked, find out the reason and eliminate it.Manual reset is replaced if it cannot be started
  Water level is too low
Put water in the sink

 
  The motor burned
Repair or replace the motor

 
  1.Line is loose
Check wiring and tighten connectors

 
  2.Frequency converter malfunction Check the fault content, check the cause according to the frequency converter manual, and restart after reset.Or disconnect the inverter power supply for a few seconds, the inverter fault reset before starting.
The manual is normal 3The frequency converter is damaged Repair or replace
Automatic transmission failure 4.Pressure switch damage Repair or replace
  5The pressure transmitter is damaged Repair or replace
  6.Switch failure Repair or replace
Pump non - suction pressure gauge pointer to beat violently Insufficient water supply for perfusion, air leakage at the connection between pipeline and instrument Check pipeline and bottom valve, refill water diversion. Tighten air leakage

The pump consumes too much power

 

Too much flow, impeller wear

 
Check whether the pump shaft is bent, replace the impeller, close the outlet valve to reduce the flow
Vertical Multistage Fire Water Pump
Vertical Multistage Fire Water Pump

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2014

Suppliers with verified business licenses

Manufacturer/Factory
Number of Employees
65
Year of Establishment
1998-09-10