Jinan, Shandong, China
Business Type: Manufacturer/Factory, Trading Company
Item | Performance | Parameters |
1 | Max. Load | 10t |
2 | Max. jib length | 60m |
3 | Tip load | 2t |
4 | Free standing height | 50m |
5 | Max. height | 180m |
6 | Size of mast section | 1.835×1.835×2.5m |
7 | Material of mast section | All mast sections are manganese,∠125×12, buckled square steel stiffened plate; Lower chord of jibs is manganese square steel. |
8 | Packing | 8-40'HQ |
9 | Delivery time | 30 days |
10 | Warranty period | One year after the equipment be installed. |
11 | The period and fees of the warranty | . In the warranty period, the seller won't charge for replacing the broken fittings that caused by the quality and will pay for the mailing fees concerned. . In the warranty period, the seller will charge cost only for the replacing fittings which caused by users don't keep the machine in good condition or don't operate in the correct way. The mailing and related fees should be paid by the buyer; . When the warranty period is expired, the seller will only charge for cost of the fittings which have been replaced. And the mailing and related fees have to be paid by the buyer; . No matter the warranty period is expired or not, should the buyer need the seller's engineer to the site of the buyer to deal with the trouble of the equipment, the buyer has to supply an interpreter and pay for the fees of round trip ticket, hotel fees, transportation fees and pay the seller's Engineer 150 US dollars per day per person; |
12 | Installation and Testing of equipment | . The Seller will send one of her experienced engineer to the Buyer's site to help the completed installation works under the requirement of the Buyer. . The Buyer is responsible for the following: A. deal with the visa for the Seller's engineer pay the round trip air ticket; Boarding and lodging; a Chinese-English interpreter; The transportation fees of the engineer in the buyer's country; responsible for the safety of the engineer in the buyer's country; Pay the engineer USD150 per working day as allowance; . Preparation work on the site should be done well. Should the reason of buyer or the customer that caused the delay of installation, they have to bear the corresponded fees. The buyer has to fill in an installation contact form by the seller and fax to the seller to ensure the preparation work is well done Before the seller's engineer arriving the site of the buyer, Should the engineer of seller arrived the site of buyer but preparation work not done, the related fees should be paid by the buyer; . The installation period can be arranged by the seller and the buyer. |
Rated Lifting Torque | kN.m | 1250 | ||||||||
Maximum Lifting Load | t | 10 | ||||||||
Work radius | m | 2.5~65 | ||||||||
Lifting Height | Independent | 50 | ||||||||
Attaching | 200 | |||||||||
Lifting Speed | 2-falls | m/min | ≤2.5 | ≤5 | ||||||
100 | 50 | |||||||||
4 falls | ≤5 | ≤10 | ||||||||
50 | 25 | |||||||||
Model of hoisting motor | TZRSWF250M2-4/8 | |||||||||
Power of hoisting motor | kW | 37 | ||||||||
Slewing Speed | r/min | 0.56 | ||||||||
Model of slewing motor | YTW132S-4 | |||||||||
Power of slewing motor | kW | 5.5×2 | ||||||||
Model of trolleying motor | YDEG180-4/8/24 | |||||||||
Power of trolleying motor | kW | 5/3/1.1kW | ||||||||
Trolleying Speed | m/min | 60/30/9 | ||||||||
Jacking Speed | m/min | 0.5 | ||||||||
Rated work pressure | MPa | 20 | ||||||||
Power of jacking motor | kW | 7.5 | ||||||||
Balanced weight | Boom (m) | 65 | 60 | 55 | 47.5 | |||||
Load (t) | 24 | 21.9 | 21 | 16.5 | ||||||
Total power | 53kW(without jacking motor) | |||||||||
Minimum Stable Falling Speed | ≤5 | |||||||||
Machine Dimension | Chassis | m | 8×8 | |||||||
Total Height | Independent | 60 | ||||||||
Attaching | 200 | |||||||||
Tip of jib to slewing center | 63.372 | |||||||||
Tip of balanced jib to slewing center | 14.82 | |||||||||
Allowable Work Temperature | ºC | -20~+40 | ||||||||
Power Supply Parameter | ~380V±10%, 50Hz; 440V/60Hz |
Mechanical load factor | Hoisting mechanism | M5 | |||
Slewing mechanism | M4 | ||||
Trolleying mechanism | M4 | ||||
Hoisting mechanism | Motor | Model | YZRDW250M-4/8 | ||
Power(kW) | 37/37 | ||||
Height limiter | Model | FKDX-G | |||
Wire steel rope | Specification | 6X37-16-1770- | |||
Max. Pulling force(N) | 25000 | ||||
Falls | a=2 | a=4 | |||
Hoisting speed (m/min) | 80 | 40 | 40 | 20 | |
Rated load (t) | 2.5 | 5 | 5 | 10 | |
Min. Descending speed | m/min | ≤5 | |||
Slewing mechanism | Motor | Model | YZR160M1-6 | ||
Power (kW) | 5.5×2 | ||||
Speed (r/min) | 908 | ||||
Reducer | Model | XX4-120AI | |||
Transmission ratio | 195 | ||||
Hydraulic coupling | Model | YOX280A | |||
Slewing small pinion | Modulus m | 12 | |||
Teeth z | 17 | ||||
Coefficient factor | +0.5 | ||||
Slewing speed | r/min | 0.61 | |||
Slewing bearings | Straight 4-point contact ball type bearings | Model | 011.45.1400 | ||
Modulus m | 12 | ||||
Teeth z | 131 | ||||
Coefficient factor | +0.5 | ||||
Hydraulic jacking mechanism | Motor | Type | Y132M2-4 | ||
Power(KW) | 7.5 | ||||
Rated work pressure of oil tank | Mpa | 25 | |||
Max. Jacking force | T | 63 | |||
Oil cylinder stroke | Mm | 1600 | |||
Installation distance | Mm | 2100 | |||
Diameter of oil tank | Mm | φ180 | |||
Diameter of cylinder piston rod | Mm | φ125 | |||
Climbing speed | m/min | 0.4 | |||
Trolleying mechanism | Motor | Model | YZTDE180M-4/8/24 | ||
Power (kW) | 5/3.7/1.1 | ||||
Wire steel rope | Specification | 6×19-9.3-1550 | |||
Reducer | Model | XX3-14.40 | |||
Transmission ratio | 39.7 | ||||
Trolleying speed | m/min | 58.6/29.3/8.79 |
Radius (m) | 2.5-18.41 | 20 | 22 | 24 | 26 | 28 | 30 | 32.8 | 34 | 36 | 38 | ||
Load (t) | 2 falls | 5.0 | 4.88 | 4.54 | 4.24 | ||||||||
4 falls | 10.0 | 9.08 | 8.11 | 7.32 | 6.65 | 6.07 | 5.58 | 5.0 | |||||
Radius (m) | 40 | 42 | 44 | 46 | 48 | 50 | 52 | 54 | 56 | 58 | 60 | ||
Load (t) | 2/4 falls | 3.98 | 3.64 | 3.52 | 3.32 | 3.14 | 2.97 | 2.81 | 2.67 | 2.54 | 2.42 | 2.30 |