Business Type: Manufacturer/Factory & Trading Company
Xiamen, Fujian, China
1) The general machine parameter | |
Suitable roll forming material | Color steel sheet or Aluminum |
Thickness | 0.4mm-0.6mm |
Feeding width |
|
Frame design | Wall-plate-frame-design /New-stand-frame-design |
Roll stages | 18 stages |
Material of forming roller | 45# steel, CNC lathes, Hard Chrome Coated |
Shafts Diameter | Φ75 mm |
Main motor power | 7.5KW with reducer |
Max. Line speed of roll former | Approx. 4m/min (stair length 350mm, production length 6m) |
Electric Standard | 380V /50Hz/3PH or as the customer's requirements |
Machine Dimensions | 8560mm×1970mm×1610mm |
Major Color of Machine Painted | RAL 5015 (Blue) or as per customer's requirements |
(2) PLC Control system | |
PLC | Siemens brand (ABB brand is available if required) |
Touch Screen | Siemens brand (ABB brand is available if required) |
Inverter | Schneider brand (ABB brand is available if required) |
Encoder | Omron brand |
(3) Product rack | |
Description | un-powered, 3 units |
(4) Options for tile roof : A.Hydraulic pre-shearing device B.Improvement for driving system for Tile roof Servo motor instead of AC motor for the roll former, to increase the production speed and the tolerance between two stairs Driving system with gear box and redirector for every three/four stages to improve the speed and tolerance control. Sprocket driving between each three/four stages. | |
(5) Service after sell | |
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excluding the electric elements. Installation: (1) If installation is needed, Liming (the seller) will dispatch technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist Liming to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation. (2) If installation is needed, the buyer shall make the following preparation before arrival of technicians. a) Position the machine in the buyer's factory. b) Prepare necessary electric wiring. c) Prepare material of trial running. d) Provide labors for assistance and installation during installation. e) If possible, One Chinese-speaking interpreter so that the communication between the buyer and seller's technician will go smoothly. |
Products with this tag will be sent out within 15 days after you place an order. For the specific sending time and delivery date, please consult the supplier.
*If the supplier with the above tags do not give you the according discount or service, you can click "Contact Us" to make a complaint. If what you said is true, our professional team will help you to handle this problem.
If you are using our website on PC, you can find us by this way:
Go down to the bottom of Made-in-China.com > Go to "Help" Section> Contact Us
If you are using our Made-in-China.com App, you can find us by this way:
My Account > Click setting section which is in the top right corner > Contact Us