• Solar Crawler Hydraulic Pile Driver Machine, Photovoltaic Guardrail Post Pile Driver (HFPV-1A)
  • Solar Crawler Hydraulic Pile Driver Machine, Photovoltaic Guardrail Post Pile Driver (HFPV-1A)
  • Solar Crawler Hydraulic Pile Driver Machine, Photovoltaic Guardrail Post Pile Driver (HFPV-1A)
  • Solar Crawler Hydraulic Pile Driver Machine, Photovoltaic Guardrail Post Pile Driver (HFPV-1A)
  • Solar Crawler Hydraulic Pile Driver Machine, Photovoltaic Guardrail Post Pile Driver (HFPV-1A)
  • Solar Crawler Hydraulic Pile Driver Machine, Photovoltaic Guardrail Post Pile Driver (HFPV-1A)

Solar Crawler Hydraulic Pile Driver Machine, Photovoltaic Guardrail Post Pile Driver (HFPV-1A)

Certification: CE, RoHS, ISO 9001:2000, ISO 9001:2008
Condition: New
Drill Hole Depth: <10m
Samples:
US$ 36000/Set 1 Set(Min.Order)
| Order Sample
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Solar Crawler Hydraulic Pile Driver Machine, Photovoltaic Guardrail Post Pile Driver (HFPV-1A) pictures & photos
Solar Crawler Hydraulic Pile Driver Machine, Photovoltaic Guardrail Post Pile Driver (HFPV-1A)
US $29,000-36,000 / Set
Min. Order: 1 Set
Diamond Member Since 2012

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory, Group Corporation

Basic Info.

Model NO.
HFPV-1A
Bit Type
H, C and U Piles.
Drilling Way
Impactor
Type
Crawler
Impact Frequeney(Bpm)
450-800
Impact(J)
1000
Work Pressure(Bar)
130-150
Once Promotion(mm)
5000
Skid Pitch(Degree)
120
Boom Swing Angle(Degree)
Left and Right Total 50
Swinging Angle of Skid(Degree)
Left and Right Total 40
Climb Ability(Degree)
35
Walk Speed(Km/H)
0--2.5
Weight(Kg)
5800
Transport Package
Machine in Nude Packing, Spare Parts in Standard E
Specification
6410*1970*2830mm
Trademark
HF
Origin
Zhengzhou City, China
HS Code
843041
Production Capacity
30 Sets/Month

Product Description

Product Description
Solar Crawler Hydraulic Pile Driver Machine, Photovoltaic Guardrail Post Pile Driver (HFPV-1A)
About HFPV-1A crawler hydraulic pile driver, its hydraulic parts adopt imported original parts, and machine has good stability, low failure rate, flexible and convenient operation, drilling boom has large swing angle, convenient for hole drilling in construction; the machine has compact structure, and mast has telescopic compensation function, during working the mast are supported on the ground, it has high borehole stability. HFPV-1A drilling rig has reliable performance, high efficiency, multifunctional applications. It is a powerful guarantee for customers to reduce costs and improve efficiency.

The HFPV-1A pile driver can be used not only for photovoltaic solar ground construction, also for anchoring, water wells, water conservancy, power plant, open mining, road building and other blasting hole constructions . (Note: The screwing and ramming power heads can be interchanged to adapt to different engineering construction technologies, which is more adaptable and more comprehensive for solar ground mounting , can save more cost for customers)
Techincal Data

Solar Crawler Hydraulic Pile Driver Machine, Photovoltaic Guardrail Post Pile Driver (HFPV-1A)
Impact frequeney(bpm) 450-800
Impact(j) 1000
Work pressure(bar) 130-150
Once promotion(mm) 5000
Skid pitch(º) 120
Boom swing angle(º) left and right total 50
Swinging angle of skid(º) left and right total 40
Climb ability(º) 35
Dimension(L*W*H)(mm) 6410*1970*2830
Weight(kg) 5800
Walk speed(km/h) 0--2.5
Working Site
Solar Crawler Hydraulic Pile Driver Machine, Photovoltaic Guardrail Post Pile Driver (HFPV-1A)
Solar Crawler Hydraulic Pile Driver Machine, Photovoltaic Guardrail Post Pile Driver (HFPV-1A)
Solar Crawler Hydraulic Pile Driver Machine, Photovoltaic Guardrail Post Pile Driver (HFPV-1A)

Company Introduction                                                                               
Hanfa Group established in 1998 is a key enterprise in the industry of geological exploration and water well field, with the ability to research,manufacture and market. Now, the Group pursues high standard manufacturing and qualified products. It has more than 20 species such as water well drilling rig, core drilling rig, engineering drilling rig, DTH drilling rig, horizontaldirectional drilling rig, etc. These machines are mainly used in geological prospecting, exploration of railway and highway engineering, mining, SPT, water well, geothermal well etc. Some of them won the Scientific and Technical Advance Prize or the National Scientific Research Achievement Prize. All the products have passed the quality system certification of ISO9001:2000 and are national inspection-free products.
Solar Crawler Hydraulic Pile Driver Machine, Photovoltaic Guardrail Post Pile Driver (HFPV-1A)
Solar Crawler Hydraulic Pile Driver Machine, Photovoltaic Guardrail Post Pile Driver (HFPV-1A)
1. More than 30 years of experience 
The factory is located in Henan Province, China. We are very welcome to visit our factory. If
you need it, we will arrange a pick-up.
2.Top production team 
The transportation and packaging will be packaged in international standards. If you have special packaging requirements, we will give you the most suitable solution.
3.Our Service 
- New machine provides technical trair.
- Once anything goes wrong with the machine by normal using, our technical person must appear at the first time no matter where you are.
- When the machine should be maintained, you will receive the reminding from us.
- According to different geological conditions, we will recommend different construction plans for you
- Remind you which are wearing parts, so you can prepare enough.
- 24 hours respond to your quality problem.


Solar Crawler Hydraulic Pile Driver Machine, Photovoltaic Guardrail Post Pile Driver (HFPV-1A)
Solar Crawler Hydraulic Pile Driver Machine, Photovoltaic Guardrail Post Pile Driver (HFPV-1A)
FAQ
1. Are you trading company or manufacturer
We are professional manufacturer, and our factory mainly produce water well drilling rig, core drilling rig, DTH drilling rig, piling rig, etc. Our products have been exported to more than 50 countries of Asia, South America, Africa, and get a good reputation in the world.

2. Are your products qualified?
Yes, our products all have gained ISO certificate,and we have specialized quality inspection department for checking every machine before leaving our factory.

3. How about your machine quality?
All of our machines hold the ISO, QC and TUV certificate, and each set of machine must pass a great number of strict testing in order to offer the best quality to our customers.

4. Do you have after service?
Yes, we have special service team which will offer you professional guidance. If you need, we can send our engineer to your worksite and provide the training for your staff.

5. What about the qaulity warranty?
We offer one-year quality warranty for machines' main body.

Our Customers                                                                                         
Solar Crawler Hydraulic Pile Driver Machine, Photovoltaic Guardrail Post Pile Driver (HFPV-1A)

Solar Crawler Hydraulic Pile Driver Machine, Photovoltaic Guardrail Post Pile Driver (HFPV-1A)

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Solar Crawler Hydraulic Pile Driver Machine, Photovoltaic Guardrail Post Pile Driver (HFPV-1A) pictures & photos
Solar Crawler Hydraulic Pile Driver Machine, Photovoltaic Guardrail Post Pile Driver (HFPV-1A)
US $29,000-36,000 / Set
Min. Order: 1 Set
Diamond Member Since 2012

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory, Group Corporation
Management System Certification
ISO 9001, ISO 14001, ISO 14000, ISO 20000, HSE