Business Type: Manufacturer/Factory & Trading Company
Foshan, Guangdong, China
Features:
1. Multiple air purification systems
2. 20L large water tank
3. 6.5m remote control for long distance
4. Adjustable 4 speeds--Low/Mid/High/Sleep mode
5. 24 hour timer shutdown, sleep in peace
6. 120° stereoscopic and wide angle air supply
7. Low noise level(45dB)
8. Ionizer function
9. Suitable for 25-30m² applicable area
10. Energy saving and environmental protection
Model: | RBW LL-V8 | Distance Of Wind(m/s) | 12m/s |
Max Airflow | 2500m³/h | Speed Level | L/M/H/Sleep speed |
Noise Level | <40dB | Power | 100W |
Fan Type | Centrifugal fan | Size Of Fan (mm) | 115*132*2 pcs |
Water Tank | 20L | Water Consumption | 0.8-1.6(L/H) |
Timer | 1-24 h | Water Shortage Warning | Yes |
Remote | Yes | Ionizer | Yes |
Applicable Area | 25-30 m³ | Color | White+Grey,White+Black |
Material | ABS Plastic | Indoor/Outdoor | Indoor |
Product Dimension | 300*390*950(H)mm | Packed Size | 330*420*995(H)mm |
N.W/G.W | 9.5/11.5KG | Loading Quantity(40HQ) | 515pcs |
Q1: Are you manufacturer or trading company?
A1: We are manufacturer, Foshan city, Guangdong, China.
Q2: Is the price of price listed above true?
A2: Yes, but as for the requirement and qty is different, the final price will be small different, so it could
be better to send us an e-mail to get the updated price.
Q3: How long can I expect to get the samples?
A3: The sample will be ready for delivery in 5-7 working days after receiving the sample charges.
Q4: What about the lead time of mass production?
A4: It depends on the order quantity and the season when you place the orders.
The lead time of MOQ is about 20-35 working days after receiving 30% deposit and confirming all artworks.
Q5. Do all your products / model have EU certification?
A5: Yes. Most of our products have CB & CE certification.