Panel automatically cutting system
Cutting adopts tracking cutting.Band saw (or fly saw) of the cutting machine can move transversely 1000mm, Cutting machine moves longitudinally and transversely along the slide way. Cutting machine adopts one-side blade band saw manner, cutting and revolving after cutting. The cutting saw can revolve, so cutting in two directions is realizable.There is panel tight-pressing system (pneumatic) in the cutting machine; There is location limiter to limit longitudinal and transverse motion of cutting machine.
TRANSPORTATION
All goods will be shipped to your country, containers number will be decided with how many machines would you choose
Installation of the machine
The individual components of the machine are installed according to the layout and prepared for the commissioning.
The installation comprises of:
- Installation by Suhang service technicians.
- The following services are included:
- Installation of the machine components.
- Adjustment of the machine components.
- Connection of all motors to the control cabinet.
- Installation of the required safety devices.
Delivery extent does not comprise of:
- Media supply (electrics, etc.)to the machine(control cabinet)
- Raw material process material
- Raw material for test
- Transport and lifting devices
- Auxiliary staff.
The operators of the plant should be present during the installation in order to become familiar with the new machines.
Commissioning of the machine
The components of the machine are commissioned one after the other. At the end of the commissioning the machine is ready for production and is handed over.
The commissioning comprises:
- Commissioning by Suhang service technicians
- Training at the machine
- The following services are rendered
- Run up of the machine components
- Testing of all functions of the machine components
- Start of a fully automatic molding process
- Execution of machine acceptance
Delivery extent does not comprise of:
- Raw materials, process materials and consumables
- Raw material for test
- Transport and lifting devices
The operators of the plant should be present during the commissioning in order to become familiar with the new machines.
Our After-Sales Service Commitments
Suhang hereby solemnly promises: We implement the "three guarantees" service policy for any equipments sold by Suhang, provide free of charge installation guidelines, commissioning and maintenance of the equipments, training of the Buyer's relevant Operators; and provide technical requirements for the installation and operation of the equipments, technical layout diagrams and other related information, provide a lifetime supply of maintenance and spare parts
The detailed measures are as follows:
1.Guidelines for installation and commissioning of equipments:
Based on the actual situation, to assist and guide the Buyer and Buyer's technical personnel in the overall installation location, the installation of equipments, and provide Buyer with answers to their questions and related issues;
2.Provide training for operation and maintenance personnel:
Based on the Buyer's request, Suhang will provide free of charge training of the operation and maintenance personnel;
a) The User (Buyer) can send their operation and maintenance personnel to our factory for learning and training;
b) When Suhang is doing the installation and test running of the equipments for the Buyer, the Buyer can send their personnel to participate.
3.If failure occurs in any of the machines during the "three guarantees" period(one year), three guarantees including the electricity parts, the rolls, the shafts and punching& cutting moulds, then, upon the Buyer's request, Suhang will eliminate the failure;
4. Suhang will inform all its Buyers about any upgrades and significant product improvements. Suhang will provide equipment modifications based on their costs. Suhang will provide Buyers with high-quality after-sales services in a careful and responsible attitude, provide very strong guarantee for the Buyer's normal production.
We provide quick and satisfactory customer service, and promise to respond within 24 hours after receiving your complaints by phone or email
Quotation: Delivery time: Payment: Assembly and commissioning: Warranty: | FOB Shanghai Approx 100 days after technical clearance and down payment 1. first payment: 40 % by T/T 2. second payment: 60% by T/T, after the successful inspection at seller's workshop, and before delivery One engineer will visit Buyer's workshop for install, commission and training, the salary of our engineer cost USD 100 per day, The customer should ensure the pre-installation being carried out appropriately, and pay round tickets, the local board and lodge. 12 months warranty, Starting from the date of the successful installation and commissioning of the equipments. |