Application fields :
it is widely used in petroleum, chemical, pharmaceutical, electroplating, environmental protection and other industries, The Medium is can be delivery flammable, explosive, toxic, expensive liquid within temperature of 350 degree .
Description:
It is produce on base of our company commonly magentic pump, absorb high temperature keep warm pump advantage , to re-design manufactured an new magnetic Pump .Jacket Keep Wam magnetic pump adopts strong magnetic high temperature materials, to ensure enough magnetic force transmission pump ; the isolation sleeve designed unequal (No-constant )section structure, it is better than Constant Section . the advantage is the reduction of 1/2 eddy current loss section;
its use an new insulation box structure design, ensure the medium in the process of conveying not cold, at the same time when the temperature is too high, cooling water is injected into the insulation box, take away much heat, can effectively guarantee the operation of motor and magnetic steel ; the hydrodynamic lubrication bearing, more reliable, more than the original concentric bearing operation of magnetic pump life;its use an new heat preservation structure to ensure that the medium will not be crystallizationin the conveying process ;it can select assembled automatic cut-off parking device, in order to avoid dry running pump if customer required .
The jacket insulation magnetic pump adopts the new technology of above, so that the pump has a higher reliability and longer service life when conveying high-temperature medium.
Designed Standard:
API685
Company certificate and honor:
ISO9001:2000, CE, BV, SGS
"National high-tech enterprise" , " Famous brand of anhui province" , "Quality management prize of anhui province" and so on.
Performance Data
Company brief:
Company gate
Exhibition room
Workshop
National level B precision water pump test center
Warehouse
FAQ
1. Q: Are you a factory or trading company?
A: We are a factory.
2. Q: How long is the warranty ?
A: Products warranty period is 1 year under the standard operation (except wearable parts)
3. Q: What're your payment term ?
A: T/T,Western Union,L/C and so on.
4. Q: How long for the delivery date ?
A: It takes 15 to 30 days.
View More