• Hot Sale Building Material Cantilever Climbing Formwork Similar to Doka
  • Hot Sale Building Material Cantilever Climbing Formwork Similar to Doka
  • Hot Sale Building Material Cantilever Climbing Formwork Similar to Doka
  • Hot Sale Building Material Cantilever Climbing Formwork Similar to Doka
  • Hot Sale Building Material Cantilever Climbing Formwork Similar to Doka
  • Hot Sale Building Material Cantilever Climbing Formwork Similar to Doka

Hot Sale Building Material Cantilever Climbing Formwork Similar to Doka

After-sales Service: One-Stop Service
Certification: ISO
Material: Steel,Plywood,Timber Beam
Type: Climbing Formwork
After-Sale Service: Online Technical Support, Onsite Installation, Ons
Project Soluction Capacity: Graphic Design, Total Solution for Projects
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Jiangsu, China
to see all verified strength labels (29)
  • Overview
  • Product Description
  • Detailed Photos
  • Characteristics
  • Packaging & Shipping
  • Our Service
  • Company Profile
  • Customer Photos
  • FAQ
Overview

Basic Info.

Application
Hotel, High Rise Buildings
Advantage
Easy Operation Quick Climbing and High Saftly Coef
Height of Bracket
10-15 Meters
Height of Climbing
3-4meters
Certificate
ISO 9001:2008
Transport Package
Standard Package
Specification
Customized
Trademark
LIANGGONG
Origin
China

Product Description

Product Description

Cantilever Climbing Formwork

The cantilever frame climbing formwork, CB-180 and CB-240, are mainly used for large-area concrete pouring, such as for dams, piers, anchors, retaining walls, tunnels and basements. The lateral pressure of concrete is borne by anchors and wall-through tie rods, so that no other reinforcement is needed for the formwork. It is featured by its simple and quick operation, wide range adjustment for one-off casting height, smooth concrete surface, and economy and durability.
The cantilever formwork CB-240 has lifting units in two types: diagonal brace type and truss type. Truss type is more suitable for the cases with heavier construction load, higher formwork erection and smaller scope of inclination.
The main difference between CB-180 and CB-240 is the main brackets. The width of main platform of these two systems is 180 cm and 240 cm respectively.  

Detailed Photos

Hot Sale Building Material Cantilever Climbing Formwork Similar to Doka
Hot Sale Building Material Cantilever Climbing Formwork Similar to DokaHot Sale Building Material Cantilever Climbing Formwork Similar to Doka
Hot Sale Building Material Cantilever Climbing Formwork Similar to DokaHot Sale Building Material Cantilever Climbing Formwork Similar to DokaHot Sale Building Material Cantilever Climbing Formwork Similar to Doka

Characteristics

Characteristics of Climbing Bracket CB180 

Economical and safe anchoring The M30/D20 climbing cones have been designed especially for single-sided concreting using CB180 in dam construction, and to allow the transfer of high tensile and shear forces into the still fresh, unreinforced concrete. Without wall-through tie-rods, finished concrete is perfect.
Stable and Cost-effective for high loads Generous bracket spacings allow large-area formwork units with optimal utilization of the bearing capacity. This leads to extremely economical solutions.
 
Simple and flexible planning With CB180 single-sided climbing formwork, circular structures can also be concreted without undergoing any large planning process. Even use on inclined walls is feasible without any special measures because additional concrete loads or lifting forces can be safely transferred into the structure.

Characteristics of Climbing Bracket CB240

High bearing capacity The high loading capacity of the brackets allow very large scaffold units. This saves the number anchor points required as well as reducing climbing times.
Simple moving procedure by crane Through the strong connection of formwork together with the climbing scaffolding,both can be moved as a single climbing unit by crane.Thus valuable time-savin gs can be achieved.
Fast striking process without a crane With the retrusive set, large formwork elements can also be retracted quickly and a minimum of effort.
Safe with work platform The platforms have assembled firmly with bracket and will be climbing together, without scaffolding but can work safely in spite of your high location.
 

Packaging & Shipping

Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.

Our Service

1.Consulting,Design,and Quotation

Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.

2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.

3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.

Company Profile

Hot Sale Building Material Cantilever Climbing Formwork Similar to DokaHot Sale Building Material Cantilever Climbing Formwork Similar to DokaHot Sale Building Material Cantilever Climbing Formwork Similar to Doka

Customer Photos

 

Hot Sale Building Material Cantilever Climbing Formwork Similar to DokaHot Sale Building Material Cantilever Climbing Formwork Similar to DokaHot Sale Building Material Cantilever Climbing Formwork Similar to Doka
 

FAQ


Q: Are you trading company or manufacturer ?
A: We are factory.


Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.


Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.


Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.

    
If you have another question, please feel free to contact us !

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
150
Year of Establishment
2010-08-25