Certification: | VDE, CCC, ISO9001 |
---|---|
Shell Material: | Stainless Steel |
Voltage Level: | High Voltage |
Samples: |
Available
|
---|
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
GGD model AC LV Withdrawable applies to power plant, substation industrial enterprise,as motive force in AC 50/60Hz,rated working voltage 380/415V,rated current 3150A and below distribution system.For transferring power energy,distributing and controlling of lightning and distribution.High breaking capacity,rated short time current will reach 50kA.Flexible circuit scheme,convenient combination,novel structure.This product conforms to IEC60439 LV Switchgear and controlgear,GB7251 LV Switchgear and controlgear etc. |
1.GGD AC LV distribution panel adopts commonly type,the frame are welded or assembled by 8MF cold bend steel,the components and special fitting of frame are supplied by our company.To keep perfect precision and quality. 2.Commonly panel components are designed reference to module principle,20 modular,high commonly factor,shorten production cycle and improve production efficiency. 3.We have taken account of heat radiation during operating when got ready to design.There are many heat radiation slotted eye from top to bottom on the body.Heat quantity will displace to direction of upper slotted eye,then the cold wind will be compensated from bottom slotted eye,when the components is heating and increase heat quantity,then form to a natural air channel. 4.GGD panel adopts modern industrial style design,adopts golden section method to design panel outline and section dimension of every parts. 5.The panel door are connected by transfer axle type moving link chain and frame,convenient to install and disassemble. 6.There is a rubber plastic bar in the place of edge and a compress travel between door and frame in closing. |
Why choose us?
Shipping & Packing
Shipping Details: Standard Export carton
Shipping Details: 7-30 day after receing the deposit
Our Service
1.Your inquiry related to our product & price will be replied within 48 hours
2.Well-trained & experienced staff are to answer all your inquiries in English
3.Working time: 8:00am ~17:30pm, Monday to Saturday. (UTC+8)
4.Customized solution & perfect after-sale service
5. Payment: we can accept T/T, L/C, Western Union.
6. For large order, engineer can be sent to your country .
Suppliers with verified business licenses