• Aws Code Heavy Pre Engineered Steel Frame Metal Building Workshop (TX-40)
  • Aws Code Heavy Pre Engineered Steel Frame Metal Building Workshop (TX-40)
  • Aws Code Heavy Pre Engineered Steel Frame Metal Building Workshop (TX-40)

Aws Code Heavy Pre Engineered Steel Frame Metal Building Workshop (TX-40)

Material: Steel Structure
Usage: Warehouse, Temporary Offices, Workshop
Certification: ISO, CE
Customized: Non-Customized
Main Structure: Welded H Section,Lattice Structure,Tubular Column
Specifications: Main Steel: Q345b, Q235B Column&Beam: Welded or Ho
Customization:
Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
43
Quality Control
The Third Party, SGS, Asia Inspection All Accept
Installation
Provide Full Set of Construction Drawings and Vide
Process Standard
American Code European Code ASTM Standard
Transport Package
by Steel Frame Bundled in Bulk Ship, by Pallet Int
Origin
China
HS Code
7308900000
Production Capacity
3000 Ton/Tons Per Week

Product Description

Aws Code Heavy Pre Engineered Steel Frame Metal Building Workshop (TX-40)
Aws Code Heavy Pre Engineered Steel Frame Metal Building Workshop (TX-40)

1. Our excellent design team will design Heavy pre engineered Steel frame metal building workshop for you
 . If you give the following information:
1 ) Location ( where will be built ? ) _____ country , area
2 ) Size : Length * width * height _____ mm * _____ mm * _____ mm
3 ) wind load ( max . Wind speed ) _____ kn / m2 , _____ km / h , _____ m / s
4 ) snow load ( max . Snow height )
_____ kn / m2 , _____ mm
5 ) anti-earthquake _____ level
6 ) brick wall needed or not If yes , 1.2m high or 1.5m high
7 ) thermal insulation If yes , EPS, fiberglass wool , rock wool , PU sandwich panels will be suggested ; If not , the metal steel sheets will be ok . The cost of the latter will be much lower than that of the former .
8 ) door quantity & size _____ units , _____ ( width ) mm * _____ ( height ) mm
9 ) window quantity & size _____ units , _____ ( width ) mm * _____ ( height ) mm
10 ) crane needed or not If yes , _____ units , max . Lifting weight ____ tons ; Max . Lifting height ___m



2. Brief of us:
We were founded in Shandong, which holds 100 million RMB registered capital. Our company is located in northern China, and it covers an area of 360, 000 square meter. Our company was specialized in the design and manufacture of steel structure workshop, high rise steel building, prefab building, and other related steel products. The products of our factory have always been wildly recognized by both abroad and domestic customers in the past ten years. In the year 2008, our company was officially designated as the main supplier of steel structure project by Shandong government. And our products that were exported to west Asia and South American etc were widely popular among our customers.
The main metal products designed and processed by our company include steel structure workshop, exhibition hall, civil structure building, high rise building, industrial steel structure for power plant, solar, oil& gas, chemical etc.
Aws Code Heavy Pre Engineered Steel Frame Metal Building Workshop (TX-40)
Aws Code Heavy Pre Engineered Steel Frame Metal Building Workshop (TX-40)
Aws Code Heavy Pre Engineered Steel Frame Metal Building Workshop (TX-40)

3. Some of OUR WORKSHOP/ WAREHOUSE PROJECTS:

1) AREVA Transformer Factory Project:
Covering an area totaled 33, 842 sq.m, the program consumed steel in 4299 tons, the column height is 31-33 m, and the inside is installed with the bunk bed traveling crane with the maximum hoisting capacity in 400 tons.
2) NEW ZEALAND Barns / Grain Warehouses:
light gauge steel structure with cold bended profiles.
3) BOLIVIA Cement Plant:
Steel consumption: 3, 655 tons in the first phase, 7200 tons in the second phase.
4) LDK Polysilicon Public Project:
Was generally contracted by FLR CO., LTD, the total steel consumption volume for Phase I project reached over 3000 tons and this program was in a high-rise steel structure of 4-7 floors.
Aws Code Heavy Pre Engineered Steel Frame Metal Building Workshop (TX-40)
Aws Code Heavy Pre Engineered Steel Frame Metal Building Workshop (TX-40)


4. How we ensure the high quality of warehouse building ( made of steel frame ) :
After years of exploration, practice and improvement, our company has built an experienced technical team in steel structure. Every project is supposed to go through the following procedures:
1) Owing plasma cutting, flame cutting, available to provide multiple cutting service.
2) Well-experienced engineer team and production team for steel structure fabrication, welder working with CWI certificate, according to WPS( welding procedure specification) and PQR( procedure qualification record) .
3) Professional non-destructive testing, fully equipped.
4) Professional surface treatment: sandblasting, paint spraying, powder coating as per American standard.
5) More than 10 years steel structure fabrication experience
6) Full set of manufacturing process plan to ensure delivery on time.
Aws Code Heavy Pre Engineered Steel Frame Metal Building Workshop (TX-40)


5. The warehouse building ( made of steel frame ) features:
1) Prefabricated and customized design.
2) Low foundation cost, thanks to the light weight of the structure itself.
3) Easy construction, time-saving, and labor saving
4) Light steel structure workshop ID flexible layout, beautiful appearances, and higher space efficiency.


6. FAQ:
1) Common type of the industrial building you supply ?
Portal frame is the usual type in the industrial workshop and warehouse shed, other types like lattice structure, space structure, etc also could be designed and manufacturer as per customers request.

2) What is the quality grade of the warehouse building ( made of steel frame ) ?
Q345 is used for main steel structure, Q235 is used for secondary steel structure.
Also we could use international steel as per your demand if order qty is big enough.

3) How about the delivery time for your warehouse building ( made of steel frame ) ?
Usually, within 30-45 days after the order confirmed, also depends on the fabrication quantity.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now