Xi'an, Shaanxi, China
Business Type: Manufacturer/Factory, Trading Company
Model | PV-04 |
Internal size(mm) | 1300(D) * 700(W) * 1350(H) |
External size(mm) | 1900(D) * 1100(W) * 1750(H) |
Effective volume | 1220Liters (1.22m3) |
Temperature range | -40°C~+100°C, controllable |
Temperature fluctuation | ±0.5ºC |
Temperature uniformity | ±2ºC |
Humidity range | 20%~98%RH, controllable |
Humidity deviation | +2,-3%RH |
Heating rate | 1 ~ 3.4 ºC/min (adjustable) |
Cooling rate | 1 ~ 3.4 ºC/min (adjustable) |
Temperature sensor | PTR Platinum Resistance PT100Ω/MV A-class |
Refrigerating unit | French TECUMSEH compressor, with environmental friendly R404A, R23 Refrigerant |
Exterior material | Steel Plate with protective coating |
Interior material | SUS304 stainless steel |
Controller | Programmable color touch screen, with RS-232 interface, able to connect to PC |
Insulation window | Double thermo stability silicone rubber sealing |
Air circulation | Cold resistance and low noise centrifugal fan and motor |
Safety protection system | Complete safety system |
Power supply | AC 380V 50Hz; 3Phase |
Standard | IEC61215, UL 1703, IEC61646 |
Title | Description |
Thermal Cycling | Ramp down from 25ºC to -40ºCat 100ºC/h max, soak for a of 10 minutes. Ramp up to 85ºC at 100ºC /h or less. Soak a minimum of 10 minutes. Then return to 25ºC, 6 hour maximum cycle time. Repeat for specified number of cycles perfigure 1"Qualification Test Sequence"of the IEC-61215 test specification(50 and/or 200 cycles). Current test profile chart is based upon module temperature |
Humidity Freeze | Ramp from room temperature with 85%RH to 85ºC/85%RH at 100 ºC/h max. Soak for 20 hours minimum. Ramp down to ambient with 85%RH at 100 ºC/h max. Ramp down to 0ºC at 100ºC/h max then to-40ºC at 200ºC/h max. Soak for 30 minute minimum. Ramp from-40ºC to 0ºC at 200ºC/h max and from 0ºC to 25ºC at 100ºC/h max Humidity must be maintained at 85% ±5% whenever temperature is 25ºC or higher. No. of Cycles: 10 cycles Current test profile chart is based upon module temperature |
Damp Heat | 85ºC,±2ºC,85%,±5%RH No of Cycles/Time: 1, 000 hour |
Standard IEC61215 , UL 1703 for PV modules climate tests | |
Test area of Chamber Test area is made of stainless-steel 1pc φ100mm cable hole at left side of workroom, with silicon sealing. Able to placing with 4pcs PV modules 1*2m 2m put in chamber deep direction, 1m on chamber height direction With adjustable sample holders as photo FYI: test room with 6 sample holders |
Pre-Sales Service * Inquiry and consulting support. * Offering quotation and specifications. * Provide test solutions. * Visiting our factory. |
After-Sales Service * 3 Years Warranty, Lifelong Follow-up Services. * Training how to install and operate the machine. * Training how to maintain the machine. * Response within 24 hours once got questions from customers. * Send spare parts within 2 days after got notice. * Engineers available to service machinery overseas to install and commissioning. |
Packed with export standard wooden case.
Strong packages can be used for sea, air, railway, truck transport and multimodal transport.
Quick ship, some models are in stock, ship in 1-3 days.
Provide door to door service for customers.