Product Description
1Title:300 Cycle Times Aluminium Concrete Formwork
2.Material:
All panels 6061-T6 aluminum alloy
Accessories waler, prop, wedge, pin, push pull prop, tie rod, wing nut, Carbon steel and casting iron
3.Product application: Monolithic casting or Separate casting(shear wall structure)
4.Inspection: Pre-assembly the panel to check product applicability before shipment
300 Cycle Times Aluminium Concrete Formwork Advantages
1. Monolithic and/or 2 stage casting
2. Stay in place posting for slab work no reshore required
3. Designed for 6100 kg per m2 of concrete pressure
4. Special bushing design
5. Special anchor bolt can be reused
6. Special coating to avoid concrete sticked on the surface of panels
7. Can be resued more than 300 times
8. No need to use plywood
Product Type: | 300 Cycle Times Aluminium Concrete Formwork |
Material(all panels): | 6061-T6 aluminum alloy |
Material(accessories) | Carbon Steel and Casting Iron |
Monolithic Casting | OK |
Safety | High |
Panel Thickness | 3-4MM |
Load Capacity | 60KN/M2 |
Cycle Time | 300 times |
Project
With more than ten years professional experience,we have been servicing contractors all over the world, such as the projects in Philippines, Thailand, Mauritius, Jordan,Chile, Dominicana Rep., UAE, Kuwait, Saudi Arabia and so on. Many famous projects such as Movenpick Hotel & SPA and Oceana Residences at Plam Jumeirah, AWAZI Gargash Tower Commerical and Residential at Dubai Marina,Six Senses in Philippines, New Parlarment and Blue Port in Thailand and so on. And also won the good reputation from the customers.
Our Factory
Alulite Forms is a professional company for designing, manufacturing and distributing construction formwork systems, such as wall, beam and slab formwork, column formwork and climbing system. We have many intellectual property rights and the patent technology including the Early stripping and big formwork entirely stripping.
We aim to supply our customers with safe, efficient, economic, environmental protecting and energy conserving products and manage to make the construction much more easier.
Exhibitions:
More Systems
OUR SERVICE:Sustainable service
Once you buy the formwork from us, we would design the layout drawing and assembly drawing for the next new project for free.
On-site Guide
An ecperienced supervisor will assist to set up the formwork on site and train your workers.
3.Extra 10% of additional supply
We offer extra 10% of short pins, wedges and other consuming accessories for free.
FAQWhat is the MOQ requirement?
It depends on the products and your project. Please feel free to contact with us.
What is the delivery time?
It depends on the the formwork quantity requirement. In general, the delivery time is about 30days to 60days.
How to do the package for shipping?
Normally, we will use pallet with foam or plywood case for packaging.
What is the payment terms?
We accept T/T 30% before production, T/T 70% against the copy of bill of lading.
Contact us Website: aluliteforms.en.made-in-china.com
Office ADD:NO.221 Haikou Road, Laoshan District, Qingdao,ChinaFactory ADD:1st East Longquan Road, Xiazhuang Town, Gaomi, China
Tel:0086 532 67702702 Dora
0086 532 85930025