Powder coating spraying production line
Production Process
spraying, drying
Process temperature
Normal temperature - 220 degrees adjustable
powder coating
Spaying gun,booth,oven
heating method
Gas, heating oil, electric heating
Workpiece conveying method
continuous
How the production line works
Workpiece spraying is step-by-step
heating method
Upload- Electrostatic spraying - Powder curing - Cooling - Unload
Name
Powder coating Line
Aftersales
overseas install and test
The whole set powder coating line should meet the requirements of high degree of automation and low energy consumption, and minimize the operating cost.
The whole set of equipment has perfect procedures, advanced process equipment, safe and good operating conditions, clean workshop environment, and is designed and manufactured according to the advanced level of similar products in the same period.
All purchased parts, consumables and equipment structure of the whole set of equipment meet customer requirements
The complete set of equipment is installed at the customer's designated location.
From the date of equipment acceptance, the company guarantees for one year and provides spare parts for long-term after-sales service.
During the process of equipment installation, commissioning and acceptance, the company provides free technical training to the buyer's operator.
After the equipment is checked and accepted, we will receive the call from the buyer in a timely manner.
curing equipment
Drying Oven
Size
Length 15m*width 3.7m*height 2m (frame height 2m)
Type of drying furnace
Bridge drying furnace
Heat source/exhaust pipe
Gas, heating oil, electric heating
furnace temperature
Normal temperature~200 degree (adjustable)
Heating time
When the room temperature is 15°C, the temperature rises to the set temperature within 45 minutes
drying time
30min
heating length
60m
Power
380V×50Hz