Type: | Professional Amplifier |
---|---|
Usage: | Hi-Fi, AV, KTV System, Public Address System |
Used For: | Specific |
Tube Type: | IC Amplifier |
Function: | Post Amplifier, Amplifier Combined, Pre-amplifier |
Sound Channel: | 2.1 |
Samples: |
---|
Customization: |
---|
Suppliers with verified business licenses
Model | FIP-9500 |
Description | IP Amplifier |
Rated Power Output | 500W |
Protocol Support | TCP/IP, UDP, IGMP (group broadcasting) |
Transmit Speed | 10/100Mbps |
Audio Format | 16 digit stereo CD tone |
Frequency Response | 20Hz~16KHz |
THD | ≤0.3% |
S/N Ratio | ≥85dB |
Connector | One RJ45 port, two mic inputs and two line input and one line output |
Speaker Output | 100V |
Working Temperature | -5ºC to +40ºC |
Humidity | 10% ~ 90% |
Power Consumption | 440W |
Power Supply | AC220V, 50-60Hz |
Dimensions | 484x420x44mm |
Weight | 8.5kg |
About us:
Deliver time:
15-20 Days after getting bank slip.
Warranty:
One year warranty after sales. if any problem happened under warranty , you can return to us and fix it.
Why choose us:
1. More than 15 years Public address system experience , with top R&D team can accept OEM and ODM order for our customers.
2. Stable quality with good quality control, quality is our life.
3. 7*24 hours quick response for technology support.
4. Various PA system product for one shop purchase.
6. System solution designed can be offered base on requirement.
7. Reasonable price for a win win business .
FAQ:
1. Are you manufacturer?
Yes, we are public address system manufacturer located in Guangzhou, China.
Welcome to visit our factory.
2. Is sample order available? Is free sample available?
Firstly, sample order is available. Secondly, for new clients, we will return the sample fee after big order placed.
3. What's your warranty period?
Our warranty period is 12 months for speaker.
4. What's your payment terms?
We accept Western Union and TT. 30% deposit in advance, balance 70% before shipment.
5. Where is your main market?
Customers are mainly from Europe, Middle East and South Asia.
6. How many days do you need to prepare for the goods?
It takes 30 working days for large order.
Suppliers with verified business licenses