After-sales Service: | 12 months |
---|---|
Warranty: | 12 months |
Max.Head: | 18M |
Samples: |
PBG4-30
|
---|
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Product description
Conditions of use
1. Conveying medium temperature does not exceed 50ºC ; Medium PH value between 6.5-8.5 ;Product parameters
Model No. |
Max .Flow | Max .Fift | Max . Power | Rated Flow | Rated Head | Piping Inside Diameter |
(m3/h) | (m) | (w) | (m3/h) | (m) | (mm) | |
PBG4-30 | 4.5 | 30 | 350 | 2.4 | 18 | DN25 |
Installation and use instructions
1. It is strictly prohibited to run empty machine with electricity and no water . When running , the pump body must be filled with water to power .
2. After installation , it is necessary to ensure that the pipeline is fully sealed , and check whether the adapter and valve leak . Stop close the valve after water stop to avoid pressure relidf resulting in no stop .
3. Unscrew the water injection plug and fill the pump chamber with clear water .
4. According to the clear water regularly clean the filter (it is recommended to chedk once every 1-3 months )
Product superiority
Application scenario
Suppliers with verified business licenses