Product Description
Hydraulic flash electric wheel rim butt welding machine
The rim butt welding machine is suitable for the welding process after the rim is formed, so that the rim is formed. The welding electrode clamps the workpiece, and the two workpieces are close. As the current density increases, the contact of the workpiece begins to melt, and part of the metal solution overflows to form an initial butt welding node. Finally, the high pressure is used for upsetting to cut off the current and the welding is completed.
Application
1. Welding of bicycles, motorcycle rings and other metal rings
2. Welding of kitchen tableware knives
3. Metal wire, metal belt, steel bar butt welding, etc.
4. Welding of various round pipes and square pipes in "L" and "T" shapes
5. Diagonal welding of window and door frames.
Detailed Photos
Product Parameters
|
Parameter |
Data |
1 |
Rated Power |
100KVA |
2 |
Rated Voltage |
380V/420V |
3 |
Rated Frequency |
50/60HZ |
4 |
Max Short Current |
24000A |
5 |
Rated Duty Cycle |
50% |
6 |
Max Clamping Force |
6500N |
7 |
Max Upsetting Force |
3000N |
8 |
Cooling Water Required |
150/H |
9 |
Weight |
450KG |
10 |
Dimensions |
100*90*150CM |
Packaging & Shipping
Package
Stable wooden package protects machine from strike and damage.
Wound plastic film keeps machine out of damp and corrosion.
Fumigation-free package helps the smooth customs clearance.
The big size machine will be fixed in container without package.
Shipping
For LCL, we cooperated with reputable logistics team to send machine to sea port speedily and safely.
For FCL, we get the container and do container loading by our skillful workers carefully.
For forwarders, we have professional and long-term cooperated forwarders who can handle the shipment smoothly. Also we would like to have seamless cooperation with your forwarder at your convenience.
FAQ
1. Q: What is the power supply of the machine?
A: The standard power supply in china is 380V, 3P, 50Hz. We also can customized accordingly.
2. Q: What information should the customer provide to get an accurate quotation from us?
A: The customer should provide the related technical requirements, drawings, pictures, industrial voltage, planned output, etc
3. Q: What is the payment term
A: The payment term is 30% down payment, and 70% before shipment(T/T mode), we also accept other payment term, like L/C, DA, D/P etc
4. Q: What is the delivery time?
A: Normally the delivery time of the machine is 30 days after receive down payment.
5. Q:What is the warrantee period of the machine?
A: The warrantee period is one year since the date of B/L.