Warranty: | 18m |
---|---|
Brand: | Geya |
Operation: | Automatic |
Samples: |
discussion
|
---|
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Series dual power automatic transfer switches are newly developed miniature household power transfer switches. This switch is mainly used to test whether the normal or standby power supply is normal When the normal power supply is abnormal, the backup power supply will work immediately to ensure the continuity, reliability, and safety of the power supply. This product is specially designed for home track TV installation and is specially used for the Pz30 distribution box.
Series of automatic transfer switches are suitable for emergency power systems 400V, 60A with AC rated current of 50v or 60HZ, compact structure, reliable conversion, easy installation, and maintenance. long life. It is widely used in various occasions where continuous power failure is not allowed. It can be operated electricallyormanuallybyATSandthecontroller.
Complies with requirements of Low-voltage Switch Gear and Control Gearspecified by IEC 60947-6-1 and EC60947-3: functional equipment and transfer switch equipment.
1. (Must be connected) Take zero line and fire line from the common control incoming line to connect AR(live wire)/AN(neutral line)
2. (Must be connected) Take zero line and fire line from the backup control incoming line to connect BR(live wire)/BN(neutral line)
3. The power indication signal is passive output, and the generator signal is taken(common) and (normally closed)
4. Connect the load end at the lower end of the(standby power supply side), Stepped wiring
5. There is an isolation board on the load. When wiring. first, remove the isolation board, connect the load and then install the isolation board(it is recommended to connect the load first, then connect the backup power supply)
Suppliers with verified business licenses